DRAFT WILLAMETTE RIVER GREENWAY DESIGN PLAN <br />Table 2.2 Test Site No. 2 <br />GPS Points Collected XX / XLF <br />Satellites Acquired 16 <br />Observations The test site is characterized by mounded topography between <br />bike path and river channel. Openings between mounded <br />topography appears to connect with water flow during flood <br />or high flow events. Deposition of woody debris, cobbles, <br />vegetation, and landform all appear to indicate the area east of <br />bike path is part of the river system and below mapped TOB. <br />Findings GPS field data points collected closely align with mapped TOB <br />line derived from GIS Hillshade data. The mapped TOB line is <br />accurate, and no adjustments are proposed. <br />Table 2.3 Test Site No. 3 <br />GPS Points Collected XX / XLF <br />Satellites Acquired N/A <br />Observations The bike path adjacent to test site is currently being realigned <br />and is under construction. The area where Millrace outfalls to <br />the river is severely incised. Riverine landforms and deposition of <br />woody debris were observed. The riverbank appears scoured by <br />flow of water. <br />Findings Due to the clear and abrupt change in slope, represented <br />accurately by the mapped TOB line, no GPS field data points were <br />taken. The mapped TOB line is accurate, and no adjustments are <br />M WILLAMETTE RIVER GREENWAY CODE AMENDMENTS I CITY OF EUGENE 40 <br />