My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Incomplete Letter
>
OnTrack
>
VEI
>
2021
>
VEI 21-7
>
Application Incomplete Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2021 4:01:07 PM
Creation date
12/30/2021 10:54:54 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
VEI
File Year
21
File Sequence Number
5
Application Name
East Ridge Village PUD
Document Type
Application Complete Letter
Document_Date
12/22/2021
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stormwater discharge to Lane County systems. <br />3- Sheet P04 is a table containing all of the existing stormwater and wastewater structures. This sheet IDs existing <br />Comments: <br />structures by calling out "Structure #XXXXX" The problem is that the numbers on this sheet do not correspond to <br />any City Structures and it makes it impossible to see the diameter of the pipes of the existing piped public system. <br />Water Supply Requirements <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />❑ <br />® <br />❑ <br />❑ <br />15. Include a diagram (including diameter) of existing and proposed water <br />mains. <br />❑ <br />® <br />❑ <br />❑ <br />16. Show existing and proposed fire hydrants. <br />Comments: <br />15- Update Sheet P10 to show the diameter of the existing and proposed water mainline. <br />16- Update Sheet P10 to show the nearest Fire Hydrant <br />Street and Utility Improvement Requirements <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />® <br />❑ <br />❑ <br />❑ <br />17. Show existing and proposed public and private improvements. <br />® <br />❑ <br />❑ <br />❑ <br />18. Note on the plan whether public improvements are to be constructed <br />public] or privately. <br />❑ <br />❑ <br />❑ <br />® <br />19. Note on the plat the location, size and species of existing and proposed <br />street trees. <br />❑ <br />❑ <br />❑ <br />® <br />20. Note on plat the location of any existing or proposed street lights. <br />Comments: <br />Contour Intervals <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />® <br />❑ <br />❑ <br />❑ <br />21. Note on the plans the City Bench Mark used. <br />® <br />One-foot contour intervals for ground slopes up to five percent. <br />❑ <br />Two-foot contour intervals for ground slopes between five and ten percent. <br />❑ <br />Five-foot contour intervals for ground slopes exceeding ten percent. <br />Comments: <br />Supporting Analysis and Documents <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />® <br />❑ <br />❑ <br />❑ 22. Submit preliminary title report per 9.8510(l). <br />Comments: <br />Geotechnical Report Requirements <br />Submitted <br />Missing/ <br />Incomplete / <br />/ <br />Inconsistent <br />Unsupported <br />N/A <br />The applicant's analysis must address EC 9.6710 and AO 58-02-25-F. <br />Complete <br />Data <br />Data <br />23. Level 1 Geotechnical Analysis has been submitted because the <br />site slopes are between 5 and 10 percent or because the <br />development includes public improvements. The report includes: <br />❑ <br />❑ <br />® <br />❑ <br />required record data; a description of the development and property; <br />a specific statement regarding the absence or presence of unstable <br />soils; and concludes that the site is suitable for the proposed <br />development without further investigation or recommendations. <br />Level 3 is required ifspecific recommendations are necessary. <br />24. Level 2 Geotechnical Analysis has been submitted because the <br />site slopes are equal to or greater than 10%. The report includes: <br />all of the Level 1 information above; test pit locations consistent with <br />❑ <br />❑ <br />❑ <br />® <br />the interval requirements in Exhibit A of AO 58-02-25-F; and test plt <br />results are profiled and show soil classifications and ground water <br />elevation. Conclusion must also be per Level 1; if not, a Level 3 is <br />required. <br />25. Level 3 Geotechnical Analysis has been submitted because either <br />❑ <br />❑ <br />❑ <br />® <br />Level 1 or Level 2 reports identified potential stability issues that <br />necessitate design-specific eotechnical recommendations. The <br />Public Works Subdivision Tentative Completeness Review Form Revised June 2016 Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.