DRAFT <br />changes in the design and location of the project elements as outlined in this report are <br />planned, we should be given the opportunity to review the changes and modify or reaffirm <br />the conclusions and recommendations of this report in writing. <br />The conclusions and recommendations submitted in this report are based on the data <br />obtained from the explorations made at the locations indicated on Figure 2 and other <br />sources of information discussed in this report. In the performance of subsurface <br />investigations, specific information is obtained at specific locations at specific times. <br />However, it is acknowledged that variations in soil conditions may exist between <br />exploration locations. This report does not reflect any variations that may occur between <br />these explorations. The nature and extent of variation may not become evident until <br />construction. If during construction, subsurface conditions differ from those encountered <br />in the explorations, we should be advised at once so that we can observe and review these <br />conditions and reconsider our recommendations where necessary. <br />Submitted for GRI, <br />Matthew Shanahan, PE, GE John K. (Jack) Gordon, PE Tadesse Meskele, PE, PhD <br />Principal Associate Senior Engineer <br />This document has been submitted electronically. <br />GRI #6497-A - 2.11VI0 Indoor Football Practice Facility Page 23 <br />August 26, 2021 <br />