City of Eugene - Site Review, Adjustment Review, and Traffic Impact Analysis Application <br />April 29, 2021 <br />Page 2 of 2 <br />Plan Sets - 3 Copies: <br />TO.1 <br />Title Sheet <br />Topographic Survey <br />C1.0 <br />Intentionally left out <br />C2.0 <br />Site Grading Plan <br />C3.0 <br />Utilities Plan <br />Al.1 <br />Site Plan & Details <br />A2.1 <br />Intentionally left out <br />A3.1 <br />Building 1 Exterior Elevations <br />A3.2 <br />Building 2 Exterior Elevations <br />L1.1 <br />Planting Plan <br />L2.1 <br />Irrigation Plan <br />L3.1 <br />Tree Preservation & Removal Plan <br />If you have any questions, please do not hesitate to call me at your convenience. Thank you for your time <br />and consideration of this proposal. <br />Sincerely, <br />Kristen Taylor, CSBA <br />Senior Director and Planning Director <br />KGT/nl <br />cc: Philip Farrington, CDC Management Corp. <br />Kelly Sandow, Sandow Engineering, LLC <br />Tina Guard, CAPITAL Engineering & Consulting, LLC <br />Chris Stillman, The Satre Group <br />ZAPROJ\201720 CDC Coburg-Elysium Development\Corresp\Agency\SlteRev+AdjRev\201720-SR-ARA_CvrLtr.docx <br />W ARCHITECTS+PLANNrRS <br />