City of Eugene - Site Review, Adjustment Review, and Traffic Impact Analysis Application <br />March 15, 2021 <br />Page 2 of 2 <br />Plan Sets - 3 Copies <br />TO.1 - Title Sheet <br />Topographic Survey <br />C1.0 - Intentionally left out <br />C2.0 - Site Grading Plan <br />C3.0- Utilities Plan <br />A1.1 - Site Plan & Details <br />A2.1 - Intentionally left out <br />A3.1 - Building 1 Exterior Elevations <br />A3.2 - Building 2 Exterior Elevations <br />L1.1 - Planting Plan <br />L2.1 - Irrigation Plan (To be provided at final Site Review submittal) <br />L3.1 - Tree Preservation & Removal Plan <br />If you have any questions, please do not hesitate to call me at your convenience. Thank you for your time <br />and consideration of this proposal. <br />Sincerely, <br />Kristen Taylor, CSBA <br />Senior Director and Planning Director <br />KGT/nl <br />cc: Philip Farrington, CDC Management Corp. <br />Kelly Sandow, Sandow Engineering, LLC <br />Tina Guard, CAPITAL Engineering & Consulting, LLC <br />Chris Stillman, The Satre Group <br />Z:\PROJ\201720 CDC Coburg-Elysium Development\Corresp\Agency\SlteRev+AdjRev\201720-SR-ARA_CvrLtr TRO.docx <br />1 MW A R C H I T E C T S+ I L A N 11 1 1 1 <br />