Per the letter dated December 23, 2020: <br />1) EC 9.8725 has been addressed in the revised findings dated January 29, 2021 <br />7) Site Plan showing the required information have been provided <br />11) Legal descriptions have been provided <br />12) The proposed vacation will be consistent with the conditions of approval for both the MP 00-3 <br />and SR-20-3 approvals. <br />13) The applicant is currently working on getting concurrence from all affected utility providers <br />15) All required signatures have been provided <br />