My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Incomplete Letter
>
OnTrack
>
MA
>
2020
>
MA 20-3
>
Application Incomplete Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 8:18:27 AM
Creation date
10/15/2020 3:49:16 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MA
File Year
20
File Sequence Number
3
Application Name
Central Eugene Industrial Park
Document Type
Application Complete Letter
Document_Date
10/15/2020
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zone Change Completeness Review Form <br />Public Works <br />AM <br />WPublic Works <br />Engineering <br />Application File Name <br />Z20-10 422 Stevenson Way <br />Date: <br />10/7/2020 <br />Current Zoning: <br />I-3 Heavy Industrial <br />Proposed <br />Zonin : <br />I-2 Light Medium Industrial <br />Reviewed by: <br />Victoria Doyle <br />Phone: <br />541-968-4930 <br />General <br />Zone change is concurrent with MA20-03 Metro Plan Amendment <br />Comments: <br />Written Statement <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />1. Provided a written statement demonstrating how the requested change <br />satisfies the criteria in Eugene Code Section 9.8865(3): "The uses and <br />® <br />❑ <br />❑ <br />❑ <br />density that will be allowed by the proposed zoning in the location of the <br />proposed change can be served through the orderly extension of key urban <br />facilities and services." <br />2. Submit a written statement describing how this request is consistent with <br />® <br />❑ <br />❑ <br />❑ <br />the Transportation Planning Rule (TPR) set forth in Oregon Administrative <br />Rule (OAR) 660-012-0060 subsection (9) <br />Comments: <br />➢ Regarding item #1 above: <br />o Wastewater: Applicant sufficiently meets this criterion. Public Wastewater services are <br />available and can be extended to serve the subject property <br />o Stormwater: Applicant sufficiently meets this criterion. Public Stormwater services are available <br />and can be extended to serve the subject property; Future development will be reviewed to meet <br />Stormwater standards. <br />o Streets: The property has frontage on arterials as well as local streets. Access standards will be <br />reviewed at the time of future development <br />➢ Regarding item #2 above, <br />This application does not meet the exemption per subsection 9; therefore, a scoping checklist and <br />TPR analysis are required and have been submitted with this application <br />Supporting In <br />formation - Transportation Planning Rule Analysis (TPRA) Scoping Checklist and Report <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />1. The TPRA Scoping Checklist is only required if the application does not <br />® <br />❑ <br />❑ <br />❑ <br />qualify under Subsection 9 of the TPR. Submit a TPRA Scoping checklist <br />and a report addressing the elements identified in the checklist. <br />Comments: <br />➢ Calculations and Scoping checklist are submitted and stamped by a licensed Engineer, Kelly Sandow and <br />Sandow Engineering. Review is concurrent with the Metro Plan amendment MA20-03 <br />Map Information <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />® <br />❑ <br />❑ <br />❑ <br />1. Provided a map indicating the property involved in the request and <br />showing adjacent streets, alleys etc. <br />® <br />❑ <br />❑ <br />❑ <br />2. Provided a vicinity map showing the general area of the request and <br />indicating the specific property involved in the request. <br />Comments <br />Referral Information <br />Yes <br />No <br />® <br />❑ <br />1. Is a full analysis required to demonstrate TPR compliance? <br />® <br />❑ <br />2. Does Team Central require a referral for this application? <br />❑ <br />® <br />3. Does Parks Planning require a referral for this application? <br />❑ <br />® <br />4. Does Traffic Operations require a referral? <br />❑ <br />® <br />5. Does Lane County require a referral? <br />❑ <br />® <br />6. Does ODOT require a referral? <br />
The URL can be used to link to this page
Your browser does not support the video tag.