My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials (1-6-2020)
>
OnTrack
>
Application Materials (1-6-2020)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 4:03:18 PM
Creation date
1/10/2020 8:00:34 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ZVR
File Year
20
File Sequence Number
1
Application Name
Conte, Paul
Document Type
Application Materials
Document_Date
1/6/2020
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Development <br />Planning <br />PROPERTY LINE ADJUSTMENT <br />APPLICATION <br />City of Eugene <br />99 West Ie Avenue <br />Eugene, Oregon 97401 <br />(541) 682-5377 <br />(541) 682-5572 Fax <br />www.eugene-or.gov <br />Please complete the following application checklist. Note that additional information may be required upon further <br />review in order to adequately address the applicable criteria for approval. If you have any questions about filling <br />out this application, please contact Planning staff at the Permit and Information Center, phone (541)682-5377, 99 <br />West 10`h Avenue, Eugene. <br />List all Assessor's Map and Tax Lot numbers of the property included in the request. <br />Assessor's Ma <br />~ Tax Lot <br />zoning <br />Existin `Use" <br />17033131 <br />100 <br />C-2/SR $ <br />Commercial <br />17033131 <br />600 <br />S/SR <br />Vacant <br />17033131 <br />800 <br />S/SR <br />Residential <br />Pending Building permit application?: <br />❑ Yes, application Number: <br />.5:1- [)0j* 0W ►J blest s tai <br />® No <br />Purpose of proposed property line change: More desirable configuration for both properties. <br />Commercial or Industrial Building(s) located on site? <br />® Yes - Submit an additional written statement and set of site plans at the time of initial submittal. <br />❑ No <br />Filing Fee <br />® A filing fee must accompany all applications. The fee varies depending upon the type of application and is <br />adjusted periodically by the City Manager. Check with Planning staff at the Permit and Information Center to <br />determine the required fee or check website at www.eugeneplanning.org <br />Written Statement (Submit 2 copies) <br />® Submit a detailed written statement describing how this request is consistent with all applicable criteria (Section <br />9.8415 of the Eugene Code) <br />® Submit documentation that the proposal complies with Section 9.8405 of the Eugene Code, which includes the <br />following requirements; <br />® For lot line removals, the property line was not platted in a partition or subdivision. <br />® The adjustment will not result in an increase in the number of parcels or lots. <br />® The proposal will not create more than 2 adjustments to any of the affected lots or parcels within a <br />calendar year. <br />® The adjustment will result in less than a 200% change in the size of a lot or parcel. <br />® The adjustment will not result in a reconfiguration as defined in the Eugene Code. <br />® The adjustment will not create a flag lot <br />Property Line Adjustment Date Last Revised: 12/2003 Pagel of 3 <br />Application Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.