My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Report
>
OnTrack
>
PDT
>
2019
>
PDT 19-1
>
Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 4:02:24 PM
Creation date
12/20/2019 8:23:53 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
19
File Sequence Number
1
Application Name
Santa Clara Transit Station
Document Type
Staff Report
Document_Date
6/19/2019
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Clara Transit Station PUD (PDT / <br />Summary of Informational items <br />Public Works <br />® Location and species of proposed street trees shall be coordinated with Public Works Urban <br />Forestry staff. <br />® Existing access connections that will not be utilized (e.g. River Rd) shall be restored to full- <br />height curb during either the Privately Engineered Public Improvement (PEPI) or building <br />permit process. <br />For more information regarding the items above, contact Donna Stark, Public Works <br />Engineering, at 541-682-5105; Dstark@eugene-or.gov <br />Fire Marshal's Office <br />® A fire hydrant is required to be within 400 feet of all portions of the building exterior. <br />The requirement is 600 feet for sprinklered buildings. EFC 507.5.1. <br />For more information regarding the items above, contact Eric Phillips-Meadow, <br />Eugene/Springfield Fire Marshal's Office, at 541-780-4048; emeadow@eugene-or.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.