DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS Aril 19, 2019 <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 p <br />• >A <br />r <br />2 Downtown Riverfront Concept Plan. January2018. Williams/Dame Associates and SERA Architects. <br />3 The regulatory approvals necessary for construction of the proposed bridge across the Willamette River, as <br />shown in Figure 2-2, are not included in this proposal. <br />City of Eugene FINAL SUBMITTAL 9 <br />Figure 2-2. Downtown Riverfront Concept Plan 2.3 <br />