My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Staff Report (8-6-19)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Planning Commission Staff Report (8-6-19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 4:02:08 PM
Creation date
8/1/2019 3:52:35 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
Capital Hill
Document Type
Staff Report
Document_Date
8/6/2019
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
individual public improvements and home sites are constructed in a way that is <br />geotechnically sound and that complies with the geotechnical analysis for the entire <br />PUD; and finding that amending Condition of Approval #10 to reference the original <br />geotechnical analysis dated February 6, 2017 and the additional analysis submitted May <br />14, 2019 will ensure the recommendations of both geotechnical analyses will apply as <br />public improvements and home sites are constructed; and <br />• Adopting the following Condition of Approval #10 (as initially adopted by the Hearings <br />Official and as amended): <br />A geotechnical analysis from a certified engineer, with specific <br />recommendations for design and construction standards, shall be provided <br />with any applications for Privately Engineered Public Improvement (PEPI) <br />permits, as well as building permits and site development permits for the <br />initial construction of infrastructure and residences on individual lots. The <br />development proposed with each permit shall adhere to the recommended <br />standards for design and construction as contained in applicant's geotechnical <br />analyses dated February 6, 2017 and May 14, 2019. <br />If the Planning Commission does not adopt the draft decision and instead decides to reverse or <br />otherwise modify its previous decision, the Planning Commission will need to articulate its <br />reasoning so that staff can prepare a revised Final Order that reflects the Planning <br />Commission's decision. <br />Once the Commission has completed its deliberations, staff will make any necessary revisions <br />to the Draft Final Order for the Commission's consideration and action at a subsequent <br />meeting, scheduled for August 13, 2019. The Planning Commission's decision on this remand <br />must be issued no later than September 4, 2019, to meet the 120-day statutory time limit for <br />these remand proceedings. <br />ATTACHMENTS <br />A hard copy of the complete record is available for free inspection at the Atrium Building, 99 <br />West 10th Avenue, between 9:00 a.m. and 4:00 p.m. Monday through Friday. Copies may also <br />be obtained by the public at cost. The entire record of materials will be provided to the <br />Planning Commission separately. The full record will also be available at the Planning <br />Commission deliberation meetings. <br />A. Final Order of the Eugene Planning Commission for Capital Hill PUD (June 14, 2018) <br />B. LUBA Final Opinion and Order (November 20, 2018) <br />C. Notice of Opportunity to Submit Written Testimony <br />D. Summary of Testimony received <br />E. Public Works Memorandum (July 29, 2019) <br />F. Draft Final Order <br />FOR MORE INFORMATION: <br />Please contact Nicholas Gioello, Associate Planner, Eugene Planning Division, by phone at: <br />(541) 682-5437, or by e-mail at: NGioello@eugene-or.gov <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.