Eugene Planning Commission <br />July 9, 2019 <br />Page 13 <br /> <br />For the above reasons, the Planning Commission should conclude that the evidence in the <br />record demonstrates that the proposal complies with the geotechnical requirements of EC 9.8320 <br />and EC 9.9630, and approve Capital Hill PUD (PDT 17-1)on remand. <br />Sincerely, <br />Bill Kloos <br />Bill Kloos <br />Attachments: <br />Attachment 1–DOGAMI map excerpts. <br />Attachment 2–SchirmerSatre Group, Letter, <br />Attachment 3–Branch Engineering, Technical Memorandum, July 3, 2019 <br />13 <br />