i~ <br />Downtown Riverfront Concept Plan 1,2 <br />Attachment B <br />.a <br />~p o <br />x j' <br />s 0.~ <br />{ c r , <br />{ Y i gyp'. <br />14, <br />~N „r vz r 4~ ; tl,. <br />At <br />0 Tit <br />c ~ E <br />~ ? 4 F <br />r <br />M <br />\'I <br />1 Downtown Riverfront Concept Plan. January 2018. Williams/Dame Associates and SERA Architects. <br />2 The regulatory approvals necessary for construction of the proposed bridge across the Willamette River, as <br />shown in the illustrative concept plan above, are not included in this proposal. <br />