My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Record Materials 5-7-19 through 5-14-19
>
OnTrack
>
CA
>
2019
>
CA 19-1
>
Open Record Materials 5-7-19 through 5-14-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 4:07:53 PM
Creation date
5/15/2019 4:49:43 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
19
File Sequence Number
1
Application Name
Downtown Riverfront
Document Type
Planning Commission Proceedings
Document_Date
5/7/2019
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. STATE LEVEL DOCUMENTATION <br />Oregon State Level Documentation of the building in accordance with the following <br />standards will be completed. This approach is similar to the standards of the Historic <br />American Buildings Survey (NABS) but allows for digital photography in place of medium or <br />large-format film photography. Documentation will include no less than: <br />An architectural description of sufficient length and detail to accurately document <br />the Warehouse Building, its site, and all related appurtenances, to include the <br />following information: <br />• The physical context of the building and how it relates to the surrounding <br />environment or property as a whole, <br />• The historical context of the Warehouse Building concerning the <br />relationship of the buildings or structures to the development of the <br />surrounding area and to trends in local and national histories, <br />• Specific historical data, including the dates of initial planning and <br />development, any changes in plan and evolution, individuals such as <br />architects or developers associated with the site, and associated historical <br />events, and <br />• A physical description of the property according to the original plan, how it <br />has changed over time, and how it is at present. <br />ii. A detailed history, of sufficient length and detail to accurately document the <br />Warehouse Building and its context, that includes the dates of construction, names <br />of architects or builders, ownership, and changes to the property, <br />iii. A bibliography of sources cited and consulted. <br />iv. A map of the Warehouse Building site on the appropriate United States Geological <br />Survey or similar map. <br />v. A scale site plan that includes all buildings.,and structures at the Warehouse Building <br />property. <br />vi. Scale floor plans of Warehouse Building. <br />vii. Digital photographs adhering to National Register digital photograph standards in <br />lieu of large-scale film photography, with each building or structure documented by <br />no less than eight (8) photos. The photographic documentation will be completed <br />and sent to SHPO for review of adequacy and completeness prior to any <br />construction or changes to the Warehouse Building. Photographs will include: <br />• General or environmental views of the property to illustrate setting, <br />landscape, adjacent buildings, and roadways, <br />• The front fagade of each building on site, <br />• Perspective view, front and one side of each building on site, <br />• Perspective view, rear and opposing side of each building on site, <br />• Detail, front entrance and/or a typical doorway, <br />• Exterior details of architectural interest, and <br />• Interior views to capture spatial relationships, typical spaces, and any <br />decorative or character defining features including hallways and stairways. <br />viii. Relevant archival materials, including original architectural drawings or maps, <br />brochures, historic photos, newspaper clippings, or other archival items of interest <br />related to the property. <br />Memorandum of Agreement <br />The EWEB HQ/Warehouse & Operations Building <br />Eugene, Lane County, Oregon <br />
The URL can be used to link to this page
Your browser does not support the video tag.