2.7 STORMWATER OPERATION AND MAINTENANCE <br />Per EC 9.6797, the privately owned and maintained stormwater facility shall be operated and <br />maintained in accordance with EC Chapters 6 and 7, and the Stormwater Management Manual. A <br />detailed O&M plan will be included in the final stormwater report. <br />The Alton Baker May 3, 2019 <br />Preliminary Stormwater Report Page 3 <br />