My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
PDT
>
2019
>
PDT 19-3
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:02:08 PM
Creation date
5/14/2019 12:42:54 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
19
File Sequence Number
3
Application Name
ALTON BAKER MULTI FAMILY
Document Type
Application Materials
Document_Date
5/14/2019
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Geotechnical Engineering Report GeoPacific <br />Project No. 18-4986,177 Day Island Road, Eugene, Oregon <br />UNCERTAINTIES AND LIMITATIONS <br />We have prepared this report for the owner and his/her consultants for use in design of this project <br />only. The conclusions and interpretations presented in this report should not be construed as a <br />warranty of the subsurface conditions. Experience has shown that soil and groundwater conditions <br />can vary significantly over small distances. Inconsistent conditions can occur between <br />explorations that may not be detected by a geotechnical study. If, during future site operations, <br />subsurface conditions are encountered which vary appreciably from those described herein, <br />GeoPacific should be notified for review of the recommendations of this report, and revision of <br />such if necessary. <br />Within the limitations of scope, schedule and budget, GeoPacific executed these services in <br />accordance with generally accepted professional principles and practices in the fields of <br />geotechnical engineering and engineering geology at the time the report was prepared. No <br />warranty, express or implied, is made. The scope of our work did not include environmental <br />assessments or evaluations regarding the presence or absence of wetlands or hazardous or toxic <br />substances in the soil, surface water, or groundwater at this site. <br />We appreciate this opportunity to be of service. <br />Sincerely, <br />GEOPACIFIC ENGINEERING, INC. <br />elln <br />fitv4w Jez'~ <br />Michael T. Baker <br />Geotechnical Staff <br />18-4986, 177 Day Island Road GRPT <br />Version 1, August 27, 2018 <br />~p PR <br />OFFS <br />474'- E <br />OREGON <br />v <br />~I~~S <br />EXPIRES: 06/30/20 M <br />James D. Imbrie, G.E., C.E.G. <br />Principal Geotechnical Engineer <br />17 GEOPACIFIC ENGINEERING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.