My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Narrative
>
OnTrack
>
CA
>
2019
>
CA 19-1
>
Application Narrative
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2019 4:02:05 PM
Creation date
4/19/2019 3:00:21 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
19
File Sequence Number
1
Application Name
Downtown Riverfront
Document Type
Application Materials
Document_Date
4/19/2019
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 <br />19,2019 <br />and visitors and, where aplropriate, to provide for the siting of necessary recreation <br />facilities including destination resorts. <br />Goal 8 requires local governmental agencies to plan for recreation areas, facilities, and opportunities. <br />This goal ensures the provision of recreational facilities to Oregon residents and is primarily <br />concerned with the provision of those facilities in non-urban areas of the state. <br />The 2018 Eugene Parks and Recreation System Plan is a 30-year strategic plan with implementation <br />recommendations for the first 10 years. The plan includes new parks and trails, improved access to <br />the Willamette River, revitalized pools and community centers, and more recreation opportunities in <br />underserved areas. The Plan was shaped by more than 12,000 residents during an extensive and <br />inclusive outreach process that garnered two resident engagement awards for the City. <br />Within the Parks and Recreation System Plan, a proposed Riverfront Park on the subject site is <br />identified as Project #C1 "Downtown Riverfront Park development at former EWEB site to serve [the <br />City Central Neighborhood Planning area]" in Appendix A Planning District Summaries and <br />Recommendations. The Plan allocates $9,000,000 in capital cost to the project and identifies it as a <br />Priority 1/2 project.8 <br />The Riverfront Park concept was originally included as a key element in the prior approved EWEB <br />Riverfront Master Plan. The S-DR Zone established a Cultural Landscape and Open Space (S-DR/CL) <br />subdistrict and designed approximately 3-acres for parks and recreation uses. In 2013, the City and <br />EWEB entered into an MOU that stated that EWEB would donate 3-acres of riverfront property to City <br />of Eugene Parks in exchange for a dedication of funds for park development in the future. <br />In 2018, the City officially took ownership of the Riverfront Park site from EWEB and finalized the <br />concept design for the Riverfront Park. In addition to the original three acres, one additional acre of <br />upland Park Plaza was added to the site as part of the redevelopment acreage to the west. Key design <br />features include: <br />■ Extensive riparian habitat enhancement; <br />■ Construction of a new bike path as a multi-modal pathway separating wheeled and pedestrian <br />path users; <br />■ Viewpoints reaching out over the river bank providing views up and down the river as it bends <br />north; <br />■ Integrated interpretive elements addressing themes of energy, ecology, industry, and culture <br />on the site; <br />■ Vibrant landscape design and native planting landscapes; <br />■ Public art; <br />■ Site lighting, benches, and other park furniture; <br />■ Programmable open space for markets, food carts, performance and other public events; and <br />■ Play areas for families and children. <br />Through the proposed amendments and related, concurrent land use applications required for <br />development of the proposed new riverfront park, the proposal will effectively increase the amount of <br />recreational capacity within downtown and riverfront areas. The proposal does not involve the siting <br />8 Eugene Parks and Recreation System Plan. Appendix A Planning District Summaries and Recommendations. <br />July 2018. <br />City of Eugene FINAL SUBMITTAL 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.