My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Site Plans (initial)
>
OnTrack
>
PDT
>
2019
>
PDT 19-1
>
Site Plans (initial)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 9:46:36 AM
Creation date
2/19/2019 9:46:35 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
19
File Sequence Number
1
Application Name
Santa Clara Transit Station
Document Type
Site Plans (initial)
Document_Date
2/12/2019
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
úǧǧúÒ!ȘúƔŴ kƔŴkǘȘ !Ŵ{ ƔȲȘŒúŴ ǿǘkúËúk!ȘúƔŴǿŒ!Ŵ{ǿk!ǘ ǘŒ!Ŵ ŴƔȘǿ <br />PLANT LIST: <br />˽ː!œœ ȀȳǨɷʑ ûŵÌƕǨū"șûƕŵ ǙǨƕɷû|| bʑˏ <br />Design Concept: <br />aǨ"ŵlé ŵÓûŵǨûŵÓ <br />The irrigation system is to be designed and constructed to be as efficient in <br />˿˽˼ ́șé ǿșǨșˍ ǿǙǨûŵÓÌûœ|ˍ ƔǨÓƕŵ ̅̃̀̃̃ <br />terms of water usage as possible. It will use water-conserving low gallon <br />ǘéƕŵˏ ́̀˽˷̃̀̂˷˼̂˿̃ <br />pop-up spray heads. All plants and planted areas are to receive irrigation. <br />{"ș|ˏ ˽˼˷˼́˷˾˼˽̃ <br />General Description: <br />The irrigation system is to be a fully automatic underground system. Backflow <br />˾ːɶǨûÌʑ ʋ"lș œƕl"șûƕŵȀ "ŵ| ǨƕȳșûŵÓ ƕÌ ʋûȀșûŵÓ ȳŵ|ǨÓǨƕȳŵ| ȳșûœûșûȀ <br />prevention device will be installed in a manner which meets or exceeds all <br />ǙǨûƕǨ șƕ Ȁș"ǨșûŵÓ ʋl"ɷ"șûƕŵː ǧǙ"ûǨ "ŵʑ |"ū"Ó șƕ ʋûȀșûŵÓ ǙûǙȀˍ <br />applicable codes. A permanent system with 100% head to head coverage <br />ȳșûœûșûȀˍ ƕǨ Ǩœ"ș| Ì"lûœûșûȀ "ș kƕŵșǨ"lșƕǨ˟Ȁ ʋǙŵȀ ûŵ " ū"ŵŵǨ <br />must be installed at all tree, shrub and groundcover plantings. <br />"ǙǙǨƕɷ| bʑ ƔɽŵǨ˟Ȁ ǧǙǨȀŵș"șûɷː <br />STAMP <br />Products: <br />˿ː{ƕ ŵƕș ûŵȀș"œœ "ŵʑ Ǚœ"ŵș ū"șǨû"œȀ ȳŵșûœ ƔɽŵǨ˟Ȁ ǧǙǨȀŵș"șûɷ é"Ȁ <br />Main and Lateral Lines: <br />Ǩɷûɽ| "ŵ| "ǙǙǨƕɷ| ûǨǨûÓ"șûƕŵ ȀʑȀșū ûŵȀș"œœ"șûƕŵˍ "Ǩ" lƕɷǨ"Ó <br />Class 200 PVC pipe is to be used throughout the project at sizes appropriate <br />b"œ"ŵlûŵÓˍ Ȁƕûœ ǙǨǙ"Ǩ"șûƕŵ "ŵ| ÌûŵûȀé ÓǨ"|ûŵÓː ǧÌûŵ șé Ȁé"Ǚ "ŵ| <br />to minimize pressure loss due to friction and to maintain velocities of water <br />ÌûŵûȀé ÓǨ"| ƕÌ Ǚœ"ŵș b|Ȁ "Ȁ |ûǨlș| bʑ ƔɽŵǨ˟Ȁ ǧǙǨȀŵș"șûɷː <br />flows at recommended levels. <br />̀ːǘǨƕșlș "œœ ʋûȀșûŵÓ șǨȀ "ŵ| Ǚœ"ŵș ū"șǨû"œȀ șƕ Ǩū"ûŵ ûŵlœȳ|ûŵÓ œûūbȀˍ <br />Heads: <br />șǨȳŵŅȀˍ ǨƕƕșȀ "ŵ| Ǩƕƕș ʧƕŵȀː <br />All sprinkler heads are to be plastic "pop-up" heads. Spray sprinklers are to <br />be used at all new planted areas. Install spray heads 3" from adjacent <br />́ːËûŵûȀé ÓǨ"| ûȀ șƕǙ ƕÌ șƕǙȀƕûœː Ūȳœlé ûȀ ûŵ "||ûșûƕŵː <br />pavement and planting edges; 6" from pavement and planting edges in <br />parking areas if located at parking stripe (24" if located within bumper <br />̂ːǘǨȳŵ "œœ ŵɽ Ǚœ"ŵș ū"șǨû"œȀ "Ȁ |ûǨlș| bʑ ƔɽŵǨ˟Ȁ ǧǙǨȀŵș"șûɷː <br />overhang area) unless directed otherwise by Landscape Architect. Adjust <br />radius on sprayheads as necessary to minimize overspray while achieving full <br />̃ːŪ"Ņ ūûŵƕǨ "|ĽȳȀșūŵșȀ ûŵ șǨ ȀǙ"lûŵÓ "Ȁ ŵllȀȀ"Ǩʑ șƕ <br />and even coverage of planted areas. <br />REVISIONS TO THIS SHEET <br />"llƕūūƕ|"ș șé ûǨǨûÓ"șûƕŵ ȀʑȀșū "Ȁ ûŵȀș"œœ|ː <br />REV.DATE <br />Valves: <br />̄ːɼéǨ ŵɽ œ"ɽŵ "bȳșȀ ʋûȀșûŵÓˍ ǙǨƕɷû| " Ȁūƕƕșé șǨ"ŵȀûșûƕŵ "ŵ| <br />All control valves are to be plastic, heavy-duty automatic globe style valves <br />ū"Ņ ǨǙ"ûǨȀ "Ȁ ŵlȀȀ"Ǩʑ șƕ ʋûȀșûŵÓ œ"ɽŵː <br />equipped with manual open and close controls. Isolation valves and thrust <br />blocks are to be installed as deemed appropriate in the mainline supply <br />̅ːǘœ"ŵș Ǥȳ"ŵșûșûȀ Ȁéƕɽŵ "Ǩ ÌƕǨ kƕŵșǨ"lșƕǨ˟Ȁ lƕŵɷŵûŵl ƕŵœʑː <br />system. Locate manual drain valves at all mainline low points <br />kƕŵșǨ"lșƕǨ ûȀ ǨȀǙƕŵȀûbœ șƕ ǙǨƕɷû| ˽˼˼̤ lƕɷǨ"Ó ƕÌ ŵșûǨ "Ǩ" "ș <br />ȀǙ"lûŵÓ Ȁéƕɽŵː <br />˽˼ːȘǨû"ŵÓœ ȀǙ"l "œœ ȀéǨȳbȀ "ŵ| ÓǨƕȳŵ|lƕɷǨȀˍ ȳŵœȀȀ ƕșéǨɽûȀ ŵƕș|ː <br />˽˽ːǘǨƕǙƕȀ| Œƕɽ ǿlǨŵ Œ"ŵ|Ȁl"Ǚ "léûɷȀ lȳūȳœ"șûɷ "Ǩ" ǨǤȳûǨ| <br />bʑ ȳÓŵ kƕ|ː ǿ ǘ"ǨŅûŵÓ !Ǩ" Œ"ŵ|Ȁl"Ǚ k"œlȳœ"șûƕŵȀː <br />˽˾ːǘǨƕǙƕȀ| œ"ŵ|Ȁl"Ǚ ū"șǨû"œ șƕ b ȳȀ| "ș Œ˷˾ œƕɽ œ"ŵ|Ȁl"Ǚ ȀlǨŵ <br />"Ǩ"Ȁ ɽûœœ lƕūǙœʑ ɽûșé kûșʑ ƕÌ ȳÓŵ !ǙǙǨƕɷ| ǘœ"ŵș ŒûȀșː <br />˽˿ː!œœ ȀșƕǨūɽ"șǨ ū"ŵ"Óūŵș Ì"lûœûșûȀ é"ɷ bŵ |ȀûÓŵ| șƕ b <br />ÌûœșǨ"șûƕŵ˷Ȁșʑœˍ Óûɷŵ șé Ŵǧkǿ Ȁƕûœ lœ"ȀȀûÌûl"șûƕŵ ƕÌ ˠkːˠ úÌ ȀȳbȀǤȳŵș <br />Óƕșléŵûl"œ șȀșûŵÓ ûŵ|ûl"șȀ Ȁƕûœ ûŵÌûœșǨ"șûƕŵ Ǩ"ș ʋl|Ȁ kûșʑ ƕÌ <br />ȳÓŵ ǿșƕǨūɽ"șǨ Ū"ŵ"Óūŵș Ū"ŵȳ"œ ūûŵûūȳū ƕÌ ́ ûŵ˝éǨˍ <br />ȀșƕǨūɽ"șǨ Ì"lûœûșʑ |ȀûÓŵ ɽûœœ b ǨɷûȀ| șƕ ûŵÌûœșǨ"șûƕŵ˷Ȁșʑœ "ș șûū ƕÌ <br />SET ISSUEDATE <br />bȳûœ|ûŵÓ ǙǨūûș "ǙǙœûl"șûƕŵ "ŵ| Ǩɷûɽː <br />Prelim SD/CE2018-12-21 <br />ǘŒ!ŴȘúŴÒ kƔŴkǘȘ !Ŵ{ ƔȲȘŒúŴ ǿǘkúËúk!ȘúƔŴǿ <br />Tentative PUD 2019-02-08 <br />Design Concept: <br />The site is located along River Road in Eugene. The planting design will <br />include urban street side plantings and building foundation plantings <br />including landscaped stormwater facilities dispersed throughout the transit <br />and parking areas. <br />PROJECT TRACKING <br />RBA #:1821 <br />Planted Setbacks: <br />A 7-ft minimum planted perimeter setback, a 7-ft minimum planted driveway <br />CLIENT #: <br />entrance setback and a minimum 15-sqft interior parking area/per parking <br />CONT #: <br />stall are required. Landscape plant types, sizes and quantities will conform to <br />P.I.C: <br />requirements set forth in Eugene Code. <br />PM / PA: <br />Tree Plantings: <br />All trees required by Eugene Code 9.6235(2) will be minimum 2" caliper at <br />the time of planting. <br />Owner <br />LANE TRANSIT DISTRICT <br />Stormwater Facility plantings: <br />Filtration Raingarden and Filtration Stormwater Planters facilities will be used <br />for treatment of stormwater. Plantings will conform to landscape standards <br />set forth in the City Of Eugene Stormwater Management manual. <br />Project Name <br />Material Qualities and Specifications: <br />SANTA CLARA <br />Plants and trees required will be selected from the City of Eugene Approved <br />TRANSIT STATION <br />Plant List and as shown on drawing and will include deciduous trees, <br />deciduous accent trees, deciduous and evergreen shrubs, grasses, and <br />Project Address <br />groundcovers. Native species as well as nonnative species that which are <br />PROJECT ADDRESS <br />adapted to site growing conditions will be used. <br />Planting Plan: <br />A complete Planting Plan, related details, and technical specifications will be <br />prepared by Cameron McCarthy Landscape Architecture & Planning and <br />LANDSCAPE PLAN <br />submitted to the City of Eugene Planning and Development Division for <br />review prior to installation. <br />PLAN <br />NOTES & SCHEDULE <br />L-501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.