My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
PDT
>
2019
>
PDT 19-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2019 11:15:22 AM
Creation date
2/19/2019 9:00:27 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
19
File Sequence Number
1
Application Name
Santa Clara Transit Station
Document Type
Application Materials
Document_Date
2/12/2019
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESBGU <br />GEOTECHNICAL INVESTIGATION <br />BACKGROUND <br />Lane Transit District (LTD) is planning to construct a newtransit stationon River <br />Road in Eugene, Oregon. The site location is shown on Figure 1A (Appendix A). <br />We understand the site was previously developed with buildings situated on the <br />northern and western portions of the lot. The buildings were demolished prior to <br />our explorations. Remnants of the building pads and associated pavements <br />remain. <br />A preliminarysite layout (Figure 2A, Appendix A) provided by Rowell Brokaw <br />indicates the planned improvements will include a bus loop, a driver support <br />building, a stormwater treatment and retention pond, and a paved parking lot. A <br />new traffic signal is also planned at the intersection of River Road and Green Lane. <br />The bus loop will include a series of boarding locations with passenger shelters and <br />associated sidewalks. We understand future improvements are planned in the <br />northern portion of the lot, which were not included as part of this project. <br />LTD is the project owner and Rowell Brokaw is the principal designer. Foundation <br />Engineering was retained by Rowell Brokaw as the geotechnical consultant. Our <br />scope of work was outlined in a proposal dated June 22, 2018 and authorized by a <br />contract dated September 24, 2018. <br />FIELD EXPLORATION <br />Boring <br />We drilled an exploratory boring (BH-1) near the intersection of River Road and <br />Green Lane on October 24, 2018. The approximate boring location is shown on <br />Figure 3A (Appendix A). The boring was drilled using a CME 55 track-mounted drill <br />rig with mud-rotary drilling techniques. Sampling was completed at 2½-foot <br />intervals to the maximum depth of ±25feet. Disturbed soil samples were obtained <br />by driving a split-spoon sampler in conjunction with the Standard Penetration Test <br />(SPT), which provides an indication of the relative stiffness or density of the soil. <br />The boring was continually logged during drilling. The final log (AppendixB) was <br />prepared based on areview of the field log, the laboratory test results, and an <br />examination of the soil samples in our office.Upon completion of the exploration, <br />the borehole was backfilled in accordance with Oregon Water Resources <br />Department (OWRD) guidelines. <br /> <br /> <br />Santa Clara Transit Center January 15, 2019 <br />Geotechnical Investigation 1 Project 2181060 <br />Eugene, Oregon Rowell Brokaw <br />
The URL can be used to link to this page
Your browser does not support the video tag.