My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hearings Official Decision
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Hearings Official Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 5:15:34 PM
Creation date
10/31/2018 5:15:30 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Hearings Official Decision
Document_Date
10/31/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and was recently acquired by the City. It is developed with an abandoned steam plant and <br />warehouse. It is zoned for commercial and residential development. <br />C. Description of Request <br />The applicant has submitted a Master Plan for the 77.4 acres that comprise the UO North <br />Campus and S-RP Riverfront Park Special Area Zone. Under the city’s code, development <br />within the S-RP zone must be in accordance with an approved Master Plan, and that Master Plan <br />must be approved through a conditional use process, with criteria specifically defined for the S- <br />RP zone. <br />The proposed Master Plan commits the UO to specific conservation areas, types of development <br />that may occur, and areas where development may potentially occur on the property. However, <br />the requested Master Plan does not seek approval for any specific development. Rather, as <br />required under the prescribed process, the Master Plan establishes an overarching conceptual <br />plan for the area, including uses that the applicant anticipates seeking to develop over time. At <br />the time each use is proposed, that proposed development would be subject to applicable <br />development standards then in effect. Because of the conceptual nature of the Master Plan, the <br />applicant has requested that the Master Plan be in effect for 30 years. <br />As noted above, the Union Pacific Railroad runs through the property and effectively divides the <br />property into two areas. Of the 77.4 acres within the North Campus, approximately 42 acres are <br />north of the railroad and border the Willamette River to the north; and approximately 35 acres <br />are south of the railroad, bordering Franklin Blvd to the south. The requested Master Plan <br />commits the area north of the railroad tracks primarily to conservation and open space, and <br />concentrates most of the potential building development to the area south of the railroad tracks. <br />The application narrative explains that prior to the UO’s ownership of the subject property, the <br />area adjacent to the Willamette River was used for industrial purposes. This area contains up to <br />20-feet of fill, causing a steep river bank. As depicted on Exhibit A of the application (Plan Set, <br />Sheets S01-C-03), the Master Plan includes enhancement of the Willamette River bank with <br />restoration of the riparian area adjacent to the river, including filling and grading the bank for a <br />more natural slope, and providing riparian restoration area and a 200-foot setback from the top of <br />bank. The Plan also identifies two bike path options along the Willamette River; one would <br />retain the existing pathway and the other would shift the path further from the riverbank to allow <br />for a larger riparian area enhancement. Of the 42 acres between the railroad tracks and the <br />Willamette River, the Master Plan commits 80% of the area for conservation and other open <br />space, up to 15% for recreational fields, and the remaining 4% for buildings. <br />The proposed Master Plan concentrates most of the building development to the area south of the <br />railroad tracks, and restricts vehicle circulation and parking primarily to that area. Building <br />development identified in that area includes a parking structure near the Riverfront Parkway. <br />That parking structure would provide parking for the adjacent Knight Campus, which is located <br />outside the S-RP zone. In addition, the Plan identifies two additional pedestrian and bicycle <br />bridge crossings over the Millrace and the railroad tracks to facilitate accessibility to and from <br />the site. <br />D. Procedural Challenges <br />Hearings Official Decision (CU 18-1; WG 18-2) 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.