Sean T. Malone <br />Attorney at Law <br />259 E. Fifth Ave., Tel. (303) 859-0403 <br />Suite 200-C Fax (650) 471-7366 <br />Eugene, OR 97401 seanmalone8@hotmail.com <br /> <br /> <br />October 3, 2018 <br /> <br />Via Electronic Mail <br /> <br />Hearings Official, City of Eugene <br />c/o Nick Gioello, NGioello@eugene-or.gov <br />Harris Hall, Lane County Public Service Building <br />th <br />125 E. 8 Ave. <br />Eugene, OR 97401 <br /> <br />Re: Post-Hearing Testimony on behalf of George Evans, Allen Hancock, and the UO <br />Riverfront Restoration and Education Group for the Conditional Use Permit (CU 18-1) <br />and Willamette Greenway Permit (WG 18-2) <br /> <br />On behalf of George Evans, Allen Hancock, and the UO Riverfront Restoration and <br />Education Group, please accept this post-hearing testimony regarding the above-referenced <br />application. For the reasons below, the application must be denied absent substantial changes to <br />the master plans proposed uses. <br /> <br />EC 9.3725(1)(b) requires that particularly with respect to <br />transportation facilities), planned public facilities shall be shown to accommodate the <br />requirements of the proposed development.Here, as noted in prior testimony, there is no <br />indication that transportation facilities, including parking structures, will accommodate the <br />requirements of the proposed development. Parking structures proposed within the master plan <br />purport to serve the Knight Campus development located within a separate special zone. See <br />Application Narrative, P. 84 ( <br />to address Knight Campus requirements per the Walnut Station Special Area Zone (S-WS) <br />requirements, ); Application Narrative, P. 35 (The site of the current Knight Campus for <br />Accelerating Scientific Impact project is located along the north side of Franklin Boulevard <br />between Onyx Street and Riverfront Parkway. It is not located in the S-RP zone (and not subject <br />to the Conditional Use Permit requirement), but will serve as an important connection between <br />the current main campus and the North Campus area.); Application Narrative, P. 2 ( <br />Campus project is also separate from the Knight Campus project.). As noted in President <br />Schills letter rejecting the University Senates resolution, President Schill noted that we do <br />need to proceed with building the parking structure in the area south of the tracks as soon as is <br />1 <br /> <br /> <br />