0021030Traffic ControlLump SumLump SumAllLump Sum$75,000.00AllLump Sum$25,000.00AllLump Sum$25,000.000050050Pedestrian Bridges (1)Sq. Ft.Sq. Ft.11,600.0$275.00$3,190,000.0011,600.0$275.00$3,190,000.0 <br />0$275.00$0.000059670Above Grade MSE Retaining WallsSq. Ft.Sq. Ft.7,500.0$30.00$225,000.007,500.0$30.00$225,000.00$30.00$0.000090080Illumination (Bridges and Undercrossing)Lump SumLump <br /> Sum1.0$175,000.00$175,000.001.0$125,000.00$125,000.001.0$50,000.00$50,000.00AllLump Sum$1,157,000.00 <br />SP10Railroad Insurance & InspectionLump SumLump SumAllLump Sum$75,000.00AllLump Sum$75,000.00AllLump Sum$200,000.000021020MobilizationLump SumLump SumAllLump Sum$354,600.00AllLump Sum$343,400.00AllLu <br />mp Sum$192,200.00VAR40Misc GradingLump SumLump SumAllLump Sum$75,000.00AllLump Sum$50,000.00AllLump Sum$50,000.00SP60Railroad Bridges (1)Sq. Ft.Sq. Ft.$575.00$0.00$575.00$0.002,400.0$575.00$1,380,000 <br />.000059680Below Grade Retailing WallsSq. Ft.Sq. Ft.$35.00$0.00$35.00$0.006,200.0$35.00$217,000.001.0$200,000.00$200,000.00$2,314,200.00Sq. Ft.Sq. Ft.3,000.0$25.00$75,000.0012,000.0$25.00$300,000.007, <br />000.0$25.00$175,000.00 <br />3,646,200 <br />No.No.ItemBid UnitEst. UnitQuantityUnit PriceTotal PriceQuantityUnit PriceTotal PriceQuantityUnit PriceTotal Price <br />Alternative B-2 (Bridge over Railroad Only)Alternative U-1 (Undercrossing Railroad) <br />44 <br />AA <br />44 <br />44 <br />44 <br />$ <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />44 <br />1.0$200,000.00$200,000.00$4,233,400.00$4,233,400.001.0$200,000.00$200,000.00$4,233,400.002.0$200,000.00$400,000.00 <br />AllLump Sum$1,482,000.00AllLump Sum$1,552,000.00AllLump Sum$1,622,000.00 <br />6,015,4006,285,4006,555,400 <br />$ $ $ <br />Alder Street Corridor Pedestrian and Bicycle RR Crossing <br />335% estimated for Alternatives B-1 and B-2 & 50% estimated for Alternative U-1 to account for additional RR construction issues <br />Engineer's Cost Estimate (Feasibility Study) <br />1.0$200,000.00$200,000.00$4,369,600.00AllLump Sum$1,529,000.00$4,369,600.001.0$200,000.00$200,000.00$1,599,000.00$4,369,600.002.0$200,000.00$400,000.00$1,669,000.00 <br />5,973,6006,243,6006,513,600 <br />2Based on 20' +/- of ROW each side of structure times length of structure inside ROW between Franklin and Railroad at 25$/SF <br />Alternative B-1 (Bridge over Franklin and <br />$ $ $ <br />City of Eugene <br />May 11, 2010 <br />Railroad) <br />TABLE 1 <br />AllAll <br />Total Cost AllTotal Cost AllTotal Cost All <br />Subtotal ConstructionSubtotal ConstructionSubtotal Construction <br />0090090Signal/Pedestrian Improv. at Franklin/Alder Intersect.Lump SumLump SumEngineering, Project Development, and Contingency (3Lump SumLump SumLump SumLump SumEngineering, Project <br /> Development, and Contingency (3Lump SumLump SumLump SumLump SumEngineering, Project Development, and Contingency (3Lump SumLump Sum <br />PERMANENT TRAFFIC CONTROL ALL ILLUMINATION SYSTEMS <br />Notes:1Based on SF bridge costs for comparable structures (see text) <br />ENHANCEMENTS - TWO SPIRAL STAIRS <br />ENHANCEMENTS - ONE SPIRAL STAIRS <br />Right-of-Way Estimate (2) <br />Add One Spiral StairsAdd Two Spiral Stairs <br />STRUCTURES <br />ROADWAY <br />Spec.Item <br /> <br />