0021030Traffic ControlLump SumLump SumAllLump Sum$75,000.00AllLump Sum$25,000.00AllLump Sum$25,000.000050050Pedestrian Bridges (1)Sq. Ft.Sq. Ft.11,600.0$275.00$3,190,000.0011,600.0$275.00$3,190,000.0
<br />0$275.00$0.000059670Above Grade MSE Retaining WallsSq. Ft.Sq. Ft.7,500.0$30.00$225,000.007,500.0$30.00$225,000.00$30.00$0.000090080Illumination (Bridges and Undercrossing)Lump SumLump
<br /> Sum1.0$175,000.00$175,000.001.0$125,000.00$125,000.001.0$50,000.00$50,000.00AllLump Sum$1,157,000.00
<br />SP10Railroad Insurance & InspectionLump SumLump SumAllLump Sum$75,000.00AllLump Sum$75,000.00AllLump Sum$200,000.000021020MobilizationLump SumLump SumAllLump Sum$354,600.00AllLump Sum$343,400.00AllLu
<br />mp Sum$192,200.00VAR40Misc GradingLump SumLump SumAllLump Sum$75,000.00AllLump Sum$50,000.00AllLump Sum$50,000.00SP60Railroad Bridges (1)Sq. Ft.Sq. Ft.$575.00$0.00$575.00$0.002,400.0$575.00$1,380,000
<br />.000059680Below Grade Retailing WallsSq. Ft.Sq. Ft.$35.00$0.00$35.00$0.006,200.0$35.00$217,000.001.0$200,000.00$200,000.00$2,314,200.00Sq. Ft.Sq. Ft.3,000.0$25.00$75,000.0012,000.0$25.00$300,000.007,
<br />000.0$25.00$175,000.00
<br />3,646,200
<br />No.No.ItemBid UnitEst. UnitQuantityUnit PriceTotal PriceQuantityUnit PriceTotal PriceQuantityUnit PriceTotal Price
<br />Alternative B-2 (Bridge over Railroad Only)Alternative U-1 (Undercrossing Railroad)
<br />44
<br />AA
<br />44
<br />44
<br />44
<br />$
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />44
<br />1.0$200,000.00$200,000.00$4,233,400.00$4,233,400.001.0$200,000.00$200,000.00$4,233,400.002.0$200,000.00$400,000.00
<br />AllLump Sum$1,482,000.00AllLump Sum$1,552,000.00AllLump Sum$1,622,000.00
<br />6,015,4006,285,4006,555,400
<br />$ $ $
<br />Alder Street Corridor Pedestrian and Bicycle RR Crossing
<br />335% estimated for Alternatives B-1 and B-2 & 50% estimated for Alternative U-1 to account for additional RR construction issues
<br />Engineer's Cost Estimate (Feasibility Study)
<br />1.0$200,000.00$200,000.00$4,369,600.00AllLump Sum$1,529,000.00$4,369,600.001.0$200,000.00$200,000.00$1,599,000.00$4,369,600.002.0$200,000.00$400,000.00$1,669,000.00
<br />5,973,6006,243,6006,513,600
<br />2Based on 20' +/- of ROW each side of structure times length of structure inside ROW between Franklin and Railroad at 25$/SF
<br />Alternative B-1 (Bridge over Franklin and
<br />$ $ $
<br />City of Eugene
<br />May 11, 2010
<br />Railroad)
<br />TABLE 1
<br />AllAll
<br />Total Cost AllTotal Cost AllTotal Cost All
<br />Subtotal ConstructionSubtotal ConstructionSubtotal Construction
<br />0090090Signal/Pedestrian Improv. at Franklin/Alder Intersect.Lump SumLump SumEngineering, Project Development, and Contingency (3Lump SumLump SumLump SumLump SumEngineering, Project
<br /> Development, and Contingency (3Lump SumLump SumLump SumLump SumEngineering, Project Development, and Contingency (3Lump SumLump Sum
<br />PERMANENT TRAFFIC CONTROL ALL ILLUMINATION SYSTEMS
<br />Notes:1Based on SF bridge costs for comparable structures (see text)
<br />ENHANCEMENTS - TWO SPIRAL STAIRS
<br />ENHANCEMENTS - ONE SPIRAL STAIRS
<br />Right-of-Way Estimate (2)
<br />Add One Spiral StairsAdd Two Spiral Stairs
<br />STRUCTURES
<br />ROADWAY
<br />Spec.Item
<br />
<br />
|