My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6.2: 20 year system cost <br />Project category Cost ($2014) <br />Projects within 20 Years <br />Roadway and multimodal projects $161,200,000 <br />Complete streets upgrades to existing streets $45,600,000 <br />Rail projects $28,400,000 <br />Pedestrian and bicycle projects $72,000,000 <br />Transit projects in multimodal corridors (multimodal corridor bundle) $171,400,000 <br />$134,200,000 (total) / $67,100,000 <br />Upon Development Projects <br />(city-funded) <br />Traffic Signal System Improvements $21,200,000 <br />Total 20 Year System Cost $634,000,000 <br />Total ODOT and City-Funded Cost (excluding transit and 50% of <br />$395,500,000 <br />upon development projects) <br />Note: (1) City- <br />revenues. Assessments for development will be developed separately. (2) Often, operational projects are not <br />included in system plans. Some are included in this funding estimate, however, due to the reliance on operational <br />improvements to address system performance needs. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.