My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5.4: Projects to be Completed Beyond 20 Years <br /> <br />Project <br />Project Description <br />No. <br />Northwest Expressway <br />B-2 <br />Provide improvements to facilitate vehicle movement along the Northwest Expressway corridor <br />Randy Pap Beltline Corridor <br />Improve frequent transit service along the Randy Pap Beltline Highway corridor with a possible <br />B-3 <br />Crescent Avenue route <br />Improve Randy Pap Beltline Highway from River Road to Coburg Road consistent with the Beltline <br />B-4 <br />Highway Facility Plan (arterial bridge and some improvements to Delta Highway/Beltline Highway <br />interchange are included in 20 year project list) <br />Intersection Projects <br />Provide improvements to address safety and delay at the Highway 99/Roosevelt Boulevard <br />B-5 <br />intersection <br />Complete Street Upgrades of Existing Streets <br />Upgrade Summit Avenue from Fairmont Boulevard to Floral Hill Drive consistent with neighborhood <br />B-6 <br />collector standards <br />Upgrade Van Duyn Street from Western Drive to Harlow Road consistent with neighborhood collector <br />B-7 <br />standards <br />I-5 from I-105 to South Urban Growth Boundary <br />Improve I-5 to six lanes; improve ramps and upgrade bridges <br />B-8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.