Table 5.4: Projects to be Completed Beyond 20 Years <br /> <br />Project <br />Project Description <br />No. <br />Northwest Expressway <br />B-2 <br />Provide improvements to facilitate vehicle movement along the Northwest Expressway corridor <br />Randy PapŽ Beltline Corridor <br />Improve frequent transit service along the Randy PapŽ Beltline Highway corridor with a possible <br />B-3 <br />Crescent Avenue route <br />Improve Randy PapŽ Beltline Highway from River Road to Coburg Road consistent with the Beltline <br />B-4 <br />Highway Facility Plan (arterial bridge and some improvements to Delta Highway/Beltline Highway <br />interchange are included in 20 year project list) <br />Intersection Projects <br />Provide improvements to address safety and delay at the Highway 99/Roosevelt Boulevard <br />B-5 <br />intersection <br />Complete Street Upgrades of Existing Streets <br />Upgrade Summit Avenue from Fairmont Boulevard to Floral Hill Drive consistent with neighborhood <br />B-6 <br />collector standards <br />Upgrade Van Duyn Street from Western Drive to Harlow Road consistent with neighborhood collector <br />B-7 <br />standards <br />I-5 from I-105 to South Urban Growth Boundary <br />Improve I-5 to six lanes; improve ramps and upgrade bridges <br />B-8 <br /> <br />