My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sidewalks <br />Project Length 2014 Cost <br />Name/Location Extent Street Side <br />No (miles) Estimate <br />River Road to River Upon <br />PB-36 <br />Wilkes Drive South side 0.87 <br />Loop #1 Development* <br />River Road to Upon <br />PB-40 <br />River Loop #1 North side 0.23 <br />Dalewood Street Development* <br />River Road to Upon <br />PB-47 <br />River Loop #1 South side 0.23 <br />Dalewood Street Development* <br />Wildish Ln to Coburg <br />Upon <br />PB-48 <br />County Farm Road North side 0.51 <br />Rd (east-west <br />Development* <br />section) <br />Wildish Ln to Coburg <br />Upon <br />PB-49 <br />County Farm Road South side 0.51 <br />Rd (east-west <br />Development* <br />section) <br />Terry Street to Upon <br />PB-57 <br />Royal Avenue North side 0.82 <br />Greenhill Road Development* <br />Terry Street to Upon <br />PB-56 <br />Royal Avenue South side 0.99 <br />Greenhill Road Development* <br />W 18th Avenue to South/east Upon <br />PB-62 <br />Willow Creek Road 1.05 <br />UGB side Development* <br />W 18th Avenue to North/eest Upon <br />PB-64 <br />Willow Creek Road 1.06 <br />UGB side Development* <br />Upon <br />PB-65 <br />Dillard Road 43rd Avenue to UGB East side 1.45 <br />Development* <br />Ross Lane to River Upon <br />PB-78 <br />Hunsaker Lane North side 0.51 <br />Road Development* <br />20-Year Total 47.99 $8,971,000 <br /> <br />20-Year Total for Pedestrian and Bicycle Projects 130.08 $71,736,282 <br />Notes: *Urban indicates that costs are incorporated into other projects along the same roadway in the Table 5.1. <br />*Upon development indicates that costs are incorporated into other projects along the same roadway in the <br />Table 5.3. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.