Sidewalks <br />Project Length 2014 Cost <br />Name/Location Extent Street Side <br />No (miles) Estimate <br />River Road to River Upon <br />PB-36 <br />Wilkes Drive South side 0.87 <br />Loop #1 Development* <br />River Road to Upon <br />PB-40 <br />River Loop #1 North side 0.23 <br />Dalewood Street Development* <br />River Road to Upon <br />PB-47 <br />River Loop #1 South side 0.23 <br />Dalewood Street Development* <br />Wildish Ln to Coburg <br />Upon <br />PB-48 <br />County Farm Road North side 0.51 <br />Rd (east-west <br />Development* <br />section) <br />Wildish Ln to Coburg <br />Upon <br />PB-49 <br />County Farm Road South side 0.51 <br />Rd (east-west <br />Development* <br />section) <br />Terry Street to Upon <br />PB-57 <br />Royal Avenue North side 0.82 <br />Greenhill Road Development* <br />Terry Street to Upon <br />PB-56 <br />Royal Avenue South side 0.99 <br />Greenhill Road Development* <br />W 18th Avenue to South/east Upon <br />PB-62 <br />Willow Creek Road 1.05 <br />UGB side Development* <br />W 18th Avenue to North/eest Upon <br />PB-64 <br />Willow Creek Road 1.06 <br />UGB side Development* <br />Upon <br />PB-65 <br />Dillard Road 43rd Avenue to UGB East side 1.45 <br />Development* <br />Ross Lane to River Upon <br />PB-78 <br />Hunsaker Lane North side 0.51 <br />Road Development* <br />20-Year Total 47.99 $8,971,000 <br /> <br />20-Year Total for Pedestrian and Bicycle Projects 130.08 $71,736,282 <br />Notes: *Urban indicates that costs are incorporated into other projects along the same roadway in the Table 5.1. <br />*Upon development indicates that costs are incorporated into other projects along the same roadway in the <br />Table 5.3. <br /> <br /> <br />