My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony (Open Record 1 to 10-3-18)
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Public Testimony (Open Record 1 to 10-3-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:38:36 AM
Creation date
10/4/2018 7:58:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Public Testimony
Document_Date
10/3/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Length 2014 Cost <br />Name/Location Extent <br />No (miles) Estimate <br />PB-555 <br />Kincaid St Path E 39th Ave to Potter St 0.13 $209,000 <br />PB-610 <br />Roosevelt Boulevard Maple St to Hwy 99 0.28 $805,000 <br />20-Year Total 8.64 $19,333,000 <br /> <br />Sidewalk Path <br />Project Length 2014 Cost <br />Name/Location Extent <br />No (miles) Estimates <br />Division Avenue sidewalk <br />PB-481 <br />Lone Oak Ave to Beaver St 0.54 $701,000 <br />path <br />Franklin Boulevard <br />PB-508 <br />Alder St to Millrace Park Path 0.18 $273,000 <br />sidewalk path <br />PB-565 <br />Commerce Street Commerce St to W 11th Ave 0.1 $157,000 <br />PB-615 <br />W 7th Ave Garfield St to Grant St 0.13 $207,000 <br />W 5th Avenue sidewalk <br /> PB-495 <br />Highway 99 to McKinley Street 0.04 $74,000 <br />path <br />20-Year Total 0.99 $1,412,000 <br /> <br />Grade Separated Path or Sidewalk <br />Project Length 2014 Cost <br />Name/Location Extent <br />No (miles) Estimates <br />PB-12 <br />Park Avenue Overpass Ruby Ave to Skipper Ave 0.18 $4,110,000 <br />PB-216 <br />Buck Street Bridge Fern Ridge Path to Buck St 0.02 $2,145,000 <br />Fern Ridge Path to Commerce Street, <br />PB-245 <br />Commerce Street Bridge 0.04 $1,550,000 <br />including .22 miles of accessway <br />PB-249 <br />Amazon Drive Footbridge W Amazon Drive to E Amazon Drive 0.01 $75,000 <br />PB-390 <br />Jay Street bridge Marshall Street to Marshall Path 0.01 $125,000 <br />PB-463 <br />I-5 Path Crossing Beltline crossing West of I-5 0.29 $1,000,000 <br />PB-559 <br />Wallis Street Bridge Fern Ridge Path to W 12th Ave 0.02 $2,145,000 <br />Grant Street to Grant Street over <br />PB-596 <br />Grant Street bridge 0.02 $900,000 <br />Amazon Creek <br />Amazon and 36th Drive <br />PB-612 <br />W Amazon to E Amazon Drives 0.01 $75,000 <br />Footbridge <br />Amazon and Dillard <br />PB-613 <br />W Amazon to E Amazon Drives 0.01 $75,000 <br />Footbridge <br />20-Year Total 0.61 $12,200,000 <br /> <br />Sidewalks <br />Project Length 2014 Cost <br />Name/Location Extent Street Side <br />No (miles) Estimate <br />W 15th Ave to Fern <br />PB-217 <br />Grant Street West side 0.03 $15,000 <br />Ridge Path <br />River Road to Scenic <br />PB-267 <br />Spring Creek Drive South side 0.39 Urban* <br />Drive <br />River Road to Scenic <br />PB-33 <br />Spring Creek Drive North side 0.51 Urban* <br />Drive <br />PB-268 <br />W 24th Street Gap at Adams Street South side 0.07 $44,000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.