My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revised Narrative 8-13-18
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Revised Narrative 8-13-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:39:58 AM
Creation date
8/15/2018 3:58:37 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
8/13/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br /> <br />expired, requesting an extension of the approval period. The applicant may request more <br />than one extension. Under no circumstances, however, can the total combined extension <br />periods exceed 36 months from the original expiration date. * * *.Æ (emphasis added) <br />When CU 88-16 was approved, the hearings official designated a 20-year completion timeline. <br />Given the precedent from the prior approval and duration of estimated timeline for completion, the <br />Applicant requests that the hearings official recognize this unique aspect of the proposal and <br />prevent the need for repeated extension requests in the future by granting a 30-year completion <br />timeline. This Conditional Use Permit request is unique because it is for a vast area of land (77 <br />acres), for most of which the university has no definitive plans and/or funding to improve yet. This <br />land use approval is required by the S-RP zone and needed by the university so that it can move <br />forward with current planned projects and accommodate future projects as the needs arise. The <br />typical timeline for university capital projects is three to six years to secure funding and complete <br />construction. Even if multiple projects were underway at once (which would be unlikely), full <br />buildout for the number of projects and improvements possible in the Master Site Plan would take <br />at least 30 years or longer. <br />CU 88-16 did not involve a request for a Willamette Greenway permit, as those provisions did not <br />exist in the EC at the time of application. Therefore, the Applicant request that the planning <br />director specify a 30 year completion timeline in the decision in order to align with the completion <br />timeline requested of the hearings official for the Conditional Use Permit. <br />8.7Conclusion <br />Based on the preceding findings and criteria, and the evidence incorporated herein, this request <br />for concurrent Conditional Use and Willamette Greenway permit approval for a project permitted <br />under the purview of the S-RP Zone demonstrates compliance with all applicable approval criteria <br />and standards. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Cameron McCarthy FINAL SUBMITTAL | Revised August 13, 2018 98 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.