My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revised Narrative 8-13-18
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Revised Narrative 8-13-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:39:58 AM
Creation date
8/15/2018 3:58:37 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U of O North Campus
Document Type
Supplemental Materials
Document_Date
8/13/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br /> <br />Reduced the allowable quantity of potential recreational fields from five to three to allow for a <br />200-foot minimum setback . This would still accommodate the necessary types of physical <br />education classes and field sports, and would likely accommodate the anticipated demand if <br />the fields were designed to be year-round. This greatly increases the distance of the fields and <br />potential field lights from the riverÈs edge and 100-foot required conservation area; <br />Added an additional bike path optionfurther from the riverÈs edge, outside the 100-foot <br />required conservation setback; <br />Committedto mitigating impacts on stormwater runoff from potential fields; <br />In addition to meeting code requirements, committed to implementing further strategies to <br />mitigate adverse impacts of field lighting and bike path lighting toward the river; and <br />Committed to restoring the riverÈs edge and Millrace conservation area as funds are available, <br />and implementing best maintenance practices for managing riparian areas, consistent with the <br />universityÈs existing Integrated Pest Management Plan. <br />Cameron McCarthy FINAL SUBMITTAL | Revised August 13, 2018 22 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.