UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br />would allow access to Franklin Boulevard. An additional crossing over the Millrace is proposed <br />west of Onyx Street in the same general location of the proposed pedestrian crossing. <br /> <br />Below is a summary table of how the proposed Master Site Plan (guided by the Regulatory Plan) <br />compares with the code requirements. <br />Figure 5-1. Comparison of Code Requirements and Proposal <br />Code Requirement Proposed <br />Required Setbacks/Conservation Areas Proposed Setbacks/Conservation Areas <br />100-foot setback/conservation area from top of 100-foot setback/conservation area from top of high <br />high bank bank <br />40-foot setback/conservation area from 40-foot setback/conservation area from Millrace top <br />Millrace top of high bank of high bank <br />Required Additional Setbacks from River and Proposed Additional Setbacks from River and <br />Millrace Outfall Millrace Outfall <br />None 200-foot riparian enhancement setback from top of <br />high bank (prohibits buildings and recreational fields) <br />Required Implementation of Riparian Proposed Implementation of Riparian Restoration <br />Restoration <br />None (although a riparian assessment and Commitment to restoring the riverÈs edge and <br />management report is required for the Millrace conservation area as funds are available. <br />application) <br />Required Integrated Pest Management Proposed Integrated Pest Management <br />None Propose to implement best maintenance practices for <br />managing riparian areas, consistent with universityÈs <br />existing IPM plan. <br />Allowed Building Coverage Proposed Building Coverage <br />40 to 50% (estimated based on requirement of Area 4: 15% (32,000 sf max footprint west of <br />40% living plant material; allows 60% for Millrace Outfall) <br />buildings and site development) <br />Area 5: 0.5% (3,000 sf max footprint between <br />Millrace Outfall and Frohnmayer Bridge) <br />Area 6: 16% (33,600 sf max footprint east of <br />Frohnmayer Bridge) <br />Allowed Field Coverage Proposed Field Coverage <br />Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 31 <br /> <br />