My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Order
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Final Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 4:01:56 PM
Creation date
6/14/2018 2:12:28 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL
Document Type
Final Order
Document_Date
6/14/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 and 34. <br />20. The Written Owner Commitment to Fund Water Infrastructure executed by the <br />applicant shall be re-executed to clarify that the Commitment applies to the entire <br />subject property, including Tax Lot 201. <br />21. Prior to occupancy of any new dwellings in the PUD, applicant shall improve that section <br />of Capital Drive abutting Lots 18 and 19, to ensure at least 21 feet of paving width within <br />the existing right-of-way. The applicant shall also improve that section of Capital Drive <br />abutting Lots 18 and 19 with a minimum 5-foot wide curbside sidewalk along the edge <br />of Capital Drive and within the existing right-of-way. The applicant shall obtain approval <br />of a Privately Engineered Public Improvement (PEPI) permit for these required street <br />improvements, and provide documentation of compliance upon completion. <br />22. The final PUD plans shall include the following note: <br />The maximum lot coverage for all lots is 50%. The square footage of any <br />preservation areas shall be excluded in the calculation of lot coverage. <br />Accordingly, the PUD is hereby approved with conditions. The foregoing findings and <br />conclusions are adopted as the Final Order of the Eugene Planning Commission on Appeal of <br />the Hearings Official's Tentative Approval for Capital Hill PUD (PDT 17-1), on this 14th day of <br />June, 2018. <br />John Barofsky, Chair" i` <br />Eugene Planning Commission <br />Attachment A: Hearings Official's Decision, dated April 20, 2018 <br />Final Order: Capital Hill PUD (PDT 17-1) Page 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.