My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Order
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Final Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 4:01:56 PM
Creation date
6/14/2018 2:12:28 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL
Document Type
Final Order
Document_Date
6/14/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The final PUD plans shall replace "Notes" #13 on sheet L3.0 of the site plans with the <br />following: <br />Any trees to be removed in Tract A, as a result of installation of the storm sewer <br />system between and near Lots 13 and 14, shall be replaced with two trees for every <br />tree removed, after the City's acceptance of the system. Replacement trees shall be <br />a native species, with a minimum caliper of 1 %2 inches for deciduous trees and a <br />minimum height of 5 feet for coniferous trees and planted in the same general area. <br />7. For all lots that border Tracts A, B, C, and D or contain a preservation area, the final PUD <br />plans shall include a temporary 10-foot construction setback area from all abutting <br />preservation areas and Tracts A, B, C, and D. The following note shall be added to the <br />final PUD plans: "For all lots that border Tracts A, B, C, and D or contain a preservation <br />area, a temporary 10-foot construction area setback from all abutting preservation <br />areas and Tracts A, B, C, and D shall be enforced during home construction, and shall <br />include temporary construction fencing." <br />8. The final plans shall include a note that states the following: <br />Within the individual preservation areas of Lot 5 and Lots 8 through 19, and on <br />Tracts A, B, C, and D, no above ground structure or fence shall be constructed; there <br />shall be no impacts to preserved trees; and no grading activity shall be allowed. The <br />only exceptions are: 1) within Tract A, where the storm drainage facility and <br />associated grading and maintenance, as shown on the site plans, is allowed; and 2) <br />the applicant's proposed 6-foot tall agricultural pass-through fence shall be allowed <br />along the entire southern, eastern, and northern boundaries of the Tract A <br />preservation area, and the preservation area along the northern boundary of Lot 5, <br />on the subject property. The placement of the agricultural fence shall occur under <br />the direction of a certified arborist, consistent with and documented by, a report <br />from the arborist demonstrating that no preservation trees will be negatively <br />impacted by the fence. <br />9. The final PUD plans shall note that street tree removals must meet the permit and <br />replacement value requirements of EC 6.305. <br />10. A geotechnical analysis from a certified engineer, with specific recommendations for <br />design and construction standards, shall be provided with any applications for Privately <br />Engineered Public Improvement (PEPI) permits, as well as building permits and site <br />development permits for the initial construction of infrastructure and residences on <br />individual lots. The development proposed with each permit shall adhere to the <br />recommended standards for design and construction as contained in the preliminary <br />geotechnical analysis approved for the tentative PUD, as well as any additional <br />geotechnical analyses required for individual permits. The geotechnical analyses <br />required for individual permits shall also address potential off-site impacts. <br />Final Order: Capital Hill PUD (PDT 17-1) Page 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.