My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2nd Open Record Period: Public Testimony (3-22-18 to 3-30-18)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
2nd Open Record Period: Public Testimony (3-22-18 to 3-30-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 2:41:50 PM
Creation date
4/2/2018 2:40:58 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/30/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GIOELLO Nick R <br />From:CW Murchison <cwmurchison@gmail.com> <br />Sent:Thursday, March 29, 2018 1:27 PM <br />To:GIOELLO Nick R <br />Subject:PDT 17-1 Rebuttal Testimony (Traffic) Please Confirm Receipt. <br />CHPUD Response to PUD Hearing Official-3-26-2018 (Massoud+Pics).pdf <br />Attachments: <br />Date: March 29, 2018 <br />To: City of Eugene Hearings Official, c/o Nick Gioello, Associate Planner <br />From: CW Murchison, Member, CHPUD Joint Neighborhood Response Committee <br />Re: Capitol Hill PUD Tentative Plan Application (PDT 17-1) Please Confirm Receipt <br />This and the following testimony in an attached PDF directly respond to the "Technical Memorandum <br />Transportation, Exhibit G of the March 21, 2018 Response from Carol Schirmer" authored by Damien <br />Gilbert of Branch Engineering, dated March 21, 2018, which was submitted during the first open- <br />record period. Specifically this testimony responds to Mr. Gilbert's comments made regarding <br />Massoud Saberian and his prior testimony. <br />Mr. Saberian has prepared a formal response to Mr. Gilbert's work, and it is attached as a PDF. <br />There are four pictures at the end of Mr. Saberian's response which show Mr. Saberian conducting <br />his on-site work (July 2017) for his analysis of Capital Dr traffic safety issues that Mr. Gilbert was <br />critiquing. These pictures show Mr. Saberian on Capital Dr. starting at the five corners and walking <br />the length of Capital Dr uphill, with the first picture showing Mr. Saberian using a tape measure to <br />verify the width of Capital Dr, and with the final picture showing Mr. Saberian on Capital Dr with the <br />“Pink House” owned by the Dreyers, which sits at the top of the hill, in the background. Mr. Saberian <br />is wearing the gray shirt, blue jeans, brown leather shoes, and sunglasses slid back on top of his <br />head. <br />These pictures firmly establish that Mr. Saberian did conduct extensive on site work to be able to <br />prepare a professional and unbiased review of the traffic safety conditions of Capital Dr, directly <br />contradicting what Mr. Gilbert said in his response. The following attachment provides a deep and <br />detailed response to Mr. Gilbert. The attachment is a PDF and is titled "CHPUD Response to PUD <br />Hearing Official-3-26-2018 (Massoud+Pics)". <br />Thank you for your consideration, <br />C.W. Murchison <br />2835 Capital Dr. <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.