My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Additional PublicTestimony submitted 3-21-18
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Additional PublicTestimony submitted 3-21-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 4:12:59 PM
Creation date
4/2/2018 8:29:17 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/21/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. A geotechnical analysis from a certified engineer, with specific recommendations for <br />design and construction standards, shall be provided with any applications for Privately <br />Engineered Public Improvement (PEPI) permits, as well as building permits and site <br />development permits for the initial construction of infrastructure, and residences on <br />individual lots. The development proposed with each permit shall adhere to the <br />recommended standards for design and construction as contained in the related <br />geotechnical analysis. <br />10. The following note shall be included on the final plans: <br />For lots 16 and 17, each lot shall have the option of constructing up to three attached <br />single-family structures. If only one single-family structure is proposed, that lot shall <br />have a maximum lot coverage of 50% of the buildable portion of the lot. If two or three <br />single-family structures are proposed, that lot shall have a maximum lot coverage of <br />65% of the buildable portion of the lot. The buildable portion of the lot shall be the area <br />identified as outside any preservation area and shall not exceed 13,500 square feet, <br />regardless of how many dwellings are developed on the lots. <br />11. The final site plan shall be revised to show a buildable area on Lots 5, 16 and 22 not to <br />exceed 13,500 square feet. <br />12. Prior to final plat approval, the applicant shall provide documentation that EWEB has <br />received a financial guarantee, ensuring water will be provided to each lot in the plat. It <br />is noted that EWEB currently accepts cash payment, bond, or an irrevocable letter of <br />credit as financial guarantees. <br />13. Prior to final PUD approval, the applicant shall revise Sheet C1- Wastewater and Water <br />Plan to include 14 foot public utility or public wastewater easements, centered on the <br />public wastewater mainlines, for all wastewater mainlines proposed on private <br />property. In the event that a public mainline is proposed for location within 7 feet from <br />the edge of a public right-of-way, a public utility or wastewater easement shall be <br />dedicated on the adjacent private property at the width necessary to ensure 14 feet of <br />operational and maintenance access to the wastewater mainline (7 feet on each side), <br />when combined with the public right-of-way within that 14 feet. <br />14. Prior to final PUD approval, the applicant shall revise Sheet C1- Wastewater and Water <br />Plan to include wastewater services for Lots 18 -19 that do not include private service <br />lines within the public right-of-way. Private service lines may be relocated on private <br />property, or public gravity service lines may be placed in the right of way. <br />15. Prior to final PUD approval, the applicant shall revise the PUD plans to include 5 foot <br />sidewalks along the east side of Capital Drive. <br />Capital Hill PUD (PDT 17-1) February 2018 61 <br />Page 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.