My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Additional PublicTestimony submitted 3-21-18
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Additional PublicTestimony submitted 3-21-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 4:12:59 PM
Creation date
4/2/2018 8:29:17 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/21/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the City's acknowledged Goal 5 inventory, per the April 12, 1978 Scenic Sites Working Paper, <br />which designates the subject site as Natural Sites of Visual Prominence and Prominent and <br />Plentiful Vegetation. Based on the South Hills Study Development Standards policy, the <br />requirements at EC 9.8320(6) regarding slope failure, and the submission of a <br />geotechnical/geologic investigation by the applicant, staff has proceeded with a review of the <br />geotechnical/geologic investigation as follows below. <br />Public Works staff confirms that the applicant's analysis, prepared by Ronald J. Derrick, P.E., <br />G.E. of Branch Engineering, Inc., which is dated February 6, 2017, meets the Level One and <br />Level Two Analysis requirements of EC 9.6710(4)(a) and (4)(b), which consists of a compilation <br />of record geological data, site conditions, sub-surface investigation and testing and a report <br />discussing site and soil characteristics in relation to the proposed development and other <br />applicable standards. The report concludes that the site is geologically and geotechnically <br />suitable for the proposed development. The report also includes a number of construction <br />recommendations including the design and construction of the proposed residential building <br />pads and foundations and public infrastructure improvements. Public Works staff concurs with <br />this initial geotechnical assessment. Adherence to the report recommendations will be required <br />during the subsequent PEPI permit, and building and site development processes, based on the <br />condition of approval recommended previously under EC 9.8320(6). <br />(e) EC 9.6730 Pedestrian Circulation On-Site. <br />The standards for on-site pedestrian circulation at EC 9.6730 are generally applicable to <br />institutional, office, commercial, multi-family residential and industrial developments. These <br />standards are not applicable to the proposed PUD. <br />(f) EC 9.6735 Public Access Required. <br />(1) Except as otherwise provided in this land use code, no building or <br />structure shall be erected or altered except on a lot fronting or abutting <br />on a public street or having access to a public street over a private <br />street or easement of record approved in accordance with provisions <br />contained in this land use code. <br />The proposed development complies with public access requirements as each of the proposed <br />lots have frontage on a public street, or have access to a public street via a private street or <br />shared access easement. Requirements for the creation of the private street are addressed per <br />the findings at EC 9.6875. Access to Lots 5-10 and 16-19 will be provided via 20 foot wide <br />shared access easements. As noted previously, one of the future subdivision application <br />requirements will include the review and approval of a joint access easement and maintenance <br />agreement that will be recorded concurrent with the final plat. <br />Based on these findings, this standard is met. <br />(2) Access from a public street to a development site shall be located in <br />accordance with EC 7.420 Access Connections - Location. If a <br />development will increase the development site's peak hour trip <br />generation by less than 50% and will generate less than 20 additional <br />Capital Hill PUD (PDT 17-1) February 2018 45 <br />Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.