My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1st Open Record Period: Public Testimony (3-19-18 to 3-21-18)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
1st Open Record Period: Public Testimony (3-19-18 to 3-21-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:12:50 AM
Creation date
3/22/2018 1:53:33 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments submitted after hearings official hearing
Document_Date
3/21/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The rendering provided by the applicant at the hearing (below) represents a significant <br />deception because the trees outside the tree preservation area are not protected by any <br />provision in the proposed Capital Hill PUD. Because of the number of the lots proposed, <br />the breadth of the Critical Root Zone for the large trees pictured in the rendering below, <br />there is no way of developing the proposed lots without destroying the trees pictured <br />below. As Forester James Merwin stated in his ForesterÈs report (attached to the Joint <br />Response Committee Document), the proposed Capital Hill PUD will create, in effect, a <br />clear cut on the ridge line that could be seen by the entire city of Eugene to the west and <br />the citizens of Laurel Hill Valley to the east. <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.