My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Report
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
Staff Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2018 8:11:05 AM
Creation date
3/21/2018 8:10:00 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Staff Report
Document_Date
3/7/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on these findings, this standard is met and will be further reviewed at the time of <br />development. <br /> <br />EC 9.6794 Stormwater Oil Control <br /> <br />This standard does not apply because the proposed development will not result in any of the <br />conditions listed under EC 9.6794(2) (a)-(d). <br /> <br /> <br />EC 9.6795 Stormwater Source Controls <br /> <br />This standard does not apply because this application will not result in any of the site uses or <br />characteristics listed under EC 9.6795(2) (a)-(h). <br /> <br />EC 9.6796 Dedication of Stormwater Easements <br /> <br />The applicant has proposed to place a portion of the public storm line on the north end of <br />Capital Drive within a 10 foot wide Public Utility Easement on the east side of the right-of-way. <br />The proposed storm pipe is 24 inches in diameter and is designed to increase the storage <br />capacity of the storm water system. Due to existing grades within the right of way, there will <br />not be adequate cover over this proposed pipe. In order to achieve proper cover over the pipe, <br />the applicant has proposed to direct the pipe alignment outside of the right-of-way to the east, <br />where there will be adequate cover over the detention pipe. <br /> <br />Based on these findings, this standard is met. <br /> <br />EC 9.6797 Stormwater Operation and Maintenance <br /> <br />As required by EC 9.6797(3)(d), applications proposing City operation and maintenance of all or <br />part of the stormwater facility must include an Operations and Maintenance Agreement in <br />accordance with the facility agreements adopted as part of the Stormwater Management <br />Manual. An agreement for the public stormwater treatment manhole will be required as part of <br />the PEPI permit process and prior to final subdivision approval. <br /> <br />As depicted on Sheet C2 Stormwater Plan, the proposed storm drainage system will include a <br />variety of public and private systems. Conditions related to Maintenance of the individual <br />systems will be imposed at the time of the individual tentative subdivision reviews. <br /> <br />Based on these findings and future permit requirements, this standard will be met. <br /> <br />(k) All other applicable development standards for features explicitly included <br />in the application except where the applicant has shown that a proposed <br />noncompliance is consistent with the purposes set out in EC 9.8300 <br />Purpose of Planned Unit Development. <br /> <br />An approved adjustment to a standard pursuant to the provisions beginning at <br />EC 9.8015 of the land use code constitutes compliance with the standard. <br /> <br />Capital Hill PUD (PDT 17-1) February 2018 52 <br />Page 52 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.