written by Gunnar Schlieder. <br />Site Visit and Site Plan L 2.0 <br />spreadsheet "Lot Slope." <br />March 2018 Geotechnical <br />EWEB Referral comments Response Committee and <br />Initial Application dated <br />Study commissioned by <br />1/19/18 Site Plan L 2.01/19/18 Site Plan L 2.0 <br />Response Committee <br />Source <br />Two <br />dated 1/19/18. <br />dated 1/15/18 <br />3/3/17. <br />Comments dated 1/15/18 indicate "the existing required domestic and fire flows to the proposed A previous iteration of the Application appears to indicate a listing of some There is <br /> no building on contains an existing 2,811 SF residence that is not building to remain." No exception for lot size is The Application proposes 26; one between Lots 20 and 21; and one <br /> where Lots 18 and 19 access Capital Drive at the hairpin average slope of the 34 lots is 23% (approximate). : CAPITAL DRIVE AT THE <br />3 access connections. One between Lots 3 and <br />Application listed some lots here. The 8/22/17 <br />The average slope of the Preservation Areas is <br />HAIRPIN TURN ABUTTING THE PROJECT IS IN <br />infrastructure (Fairmount 975 Pump Station) <br />mentioned here. Site plan notates "Existing <br />EXCESS OF 15%, IN VIOLATION OF EC 7.420. <br />development site is not relatively flat. The <br />. Lot 4 is 21,807 SF & <br />: The <br />: EWEB Referral <br />lots is to follow, but no data is present. <br />Misleading/Inaccurate Information <br />Issue <br />ever requested for Lot 4. <br />Inaccurate Information. <br />Inaccurate Information: <br /> Inaccurate Information <br />Inaccurate Information <br />CAPITAL HILL PUD - INCONSISTENCIES OF APPLICATION ( August 22, 2017 Application and Supporting Materials) <br />Missing Information: <br />Inaccuracy/Omission <br />estimated at 40%. <br />development." <br />Page 7 of 11 <br />Lot 22. <br />turn. <br />On Page 48 (middle) in section on Exemptions to the Solar Lot Requirements, the Application states "The lots that slope buildings and other physical features associated with those <br />Connection-Location (1) (b) the Application states: "There <br />20 percent or more in a direction greater than 45 degrees <br />Connection-Location (1) (a) the Application states: "the 2 <br />"Lots 20, 22, and 23 contain existing buildings and other <br />Connection-Location (1) (b) the Application states: "The <br />In discussing exceptions to 13,500 SF max lot area, the <br />development site is relatively "flat" as is the street the <br />On Page 47 (middle), the Application states "all public <br />Application lists "Lots 20, 22, and 23 contain existing <br />At the top of Page 54 in the Section on 7.420 Access At the top of Page 54 in the Section on 7.420 Access At the top of Page 54 in the Section on 7.420 Access <br />facilities and services are available to the site." <br />east or west of true south are :__________." <br />are no streets that are over 15%." <br />Item <br />development fronts." <br />Page 47 of 67Page 48 of 67Page 49 of 67Page 49 of 67Page 54 of 67Page 54 of 67Page 54 of 67 <br />3/5/2018 <br />Source <br />One <br />47484949545454 <br />No. <br />38394041424344 <br /> <br />