additional homes being proposed. EWEB staff has indicated the determining factor in analyzing future water flow requirements for <br />the proposed PUD is the flow required for the two additional proposed fire hydrants. <br />What are the estimated flow requirements for the two new hydrants being proposed in the PUD? <br />Will the existing fire hydrants in the immediate vicinity require any additional improvements, or will the flow capacity, or availability, <br />to these existing hydrants need to be increased? <br />Thank you, <br />Brent Lorscheider/ <br />Brent Lorscheider <br />Ph: 6266275049 <br />