T L Nick <br />From: <br />Brent Lorscheider <lorsch2728@pacbell.net> <br />Sent: <br />Wednesday, April 05, 2017 11:57 PM <br />To: <br />GIOELLO Nick R <br />Cc: <br />Tom Bruno <br />Subject: <br />Cap Hill PUD - Utilities <br />Hi Mick, <br />Can u pls forward this request to the appropriate department within the City: <br />Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the Capital Hill <br />PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches: <br />Location <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Condition <br />Maintenance and cleaning history <br />Spill or overflow records <br />Request for the following information regarding the streets that will bear the traffic burden during construction and post construction <br />of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount: <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Maintenance history <br />Thank you, Brent <br />1 <br />