My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUBLIC CORRESPONDENCE - Batch A
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
PUBLIC CORRESPONDENCE - Batch A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 4:01:00 PM
Creation date
3/7/2018 10:15:24 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Misc.
Document_Date
3/6/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The depth and detail of the other parts of your request will require staff time to retrieve and organize. This <br />must be requested as a records request through the City Recorder's Office: <br />https://www.eugene-or.gov/519/Public-Records <br />I have attached a form for you. <br />Thanks, <br />Nick <br />From: Brent Lorscheider rmailto:lorsch2728(a,pacbell.net] <br />Sent: Wednesday, April 05, 2017 11:57 PM <br />To: GIOELLO Nick R <Nick. R.Gioello(a7ci.eugene.or.us> <br />Cc: Tom Bruno <brunoassoc(@aol.com> <br />Subject: Cap Hill PUD - Utilities <br />Hi Nick, <br />Can u pls forward this request to the appropriate department within the City: <br />Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the <br />Capital Hill PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches: <br />Location <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Condition <br />Maintenance and cleaning history <br />Spill or overflow records <br />Request for the following information regarding the streets that will bear the traffic burden during construction and post <br />construction of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount: <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Maintenance history <br />Thank you, Brent <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.