The depth and detail of the other parts of your request will require staff time to retrieve and organize. This <br />must be requested as a records request through the City Recorder's Office: <br />https://www.eugene-or.gov/519/Public-Records <br />I have attached a form for you. <br />Thanks, <br />Nick <br />From: Brent Lorscheider rmailto:lorsch2728(a,pacbell.net] <br />Sent: Wednesday, April 05, 2017 11:57 PM <br />To: GIOELLO Nick R <Nick. R.Gioello(a7ci.eugene.or.us> <br />Cc: Tom Bruno <brunoassoc(@aol.com> <br />Subject: Cap Hill PUD - Utilities <br />Hi Nick, <br />Can u pls forward this request to the appropriate department within the City: <br />Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the <br />Capital Hill PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches: <br />Location <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Condition <br />Maintenance and cleaning history <br />Spill or overflow records <br />Request for the following information regarding the streets that will bear the traffic burden during construction and post <br />construction of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount: <br />Design drawings <br />As built drawings <br />Capacity studies <br />Age <br />Maintenance history <br />Thank you, Brent <br />4 <br />