My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUBLIC COMMENTS (as of 3-1-18)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
PUBLIC COMMENTS (as of 3-1-18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 4:03:07 PM
Creation date
3/1/2018 3:16:42 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Public Comments
Document_Date
3/1/2018
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The treatment for the street was a 27 to 4" cold plane pavement removal followed by 2° to 4" of ACP. <br />With T' to 8" of ACP, the traffic count could more than double and the street would meet the design <br />requirements. <br />Due to the lack of as-builts a number of pavement cores were taken on Spring. The street structure was not <br />very. consistent -some of the cores indicated Y-4" of ACP on degraded PCC, and other were Y-6,' of ACP on <br />aggregate. The 20 year ESAL is 247,488. Similar to Capital, the treatment was to remove the ACP to PCC <br />and re-pave with 4" of ACP. During construction, the street did not indicate any "soft" areas, so the re-paving <br />is expected to perform well under the design loadings, and is probably sufficient to handle an increase volume <br />of traffic. <br />PWE has not done any work or research on Fairmount or 21 st <br />From: FAVREAU Eric J <br />Sent: Tuesday, September 12, 2017 9:43 AM <br />To: HIGGINS Teri L <Teri. L. Higgins(cDci.eugene.or.up <br />Subject: Fwd: Email for E.Favreau <br />Hi Teri, <br />The neighbors of Capital Hill were curious about the pavement design of Capital Drive. Do you have <br />that info? See email below. <br />Thanks, <br />Eric <br />Sent from my iPhone <br />Begin forwarded message: <br />From: GIOELLO Nick R <Nick. R.Gioello(a-),ci.eugene.or.us> <br />Date: September 8, 2017 at 8:14:34 AM PDT <br />To: FAVREAU Eric J <Eric.J.Favreau(a~ci.eugene.or.us> <br />Subject: FW: Email for E.Favreau <br />From: CW Murchison [mailto:cwmurchison(cDgmail.coml <br />Sent: Thursday,_ September 07, 2017 10:35 PM <br />To: GIOELLO Nick R <Nick. R.Gioello(cbci.eugene.or.us> <br />Cc: faris cassell <fcasse11(5~comcast.net> <br />Subject: Email for E.Favreau <br />Nick just a quick request to Eric Favreau. Could you please forward this to him. Thanks. <br />What were the load estimates/assumptions used in the equations/calculations for the 20 or 30 <br />year life of road construction standard for Capital Dr., Spring, Fairmount and 21 st along the <br />likely traffic routes to the CHPUD <br />Thanks so much once again, <br />
The URL can be used to link to this page
Your browser does not support the video tag.