My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 8:24:25 AM
Creation date
2/26/2018 5:26:03 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U OF O NORTH CAMPUS
Document Type
Application Materials
Document_Date
2/26/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Access -- Parking Area Development <br />Show location, number, and dimensions of existing and proposed parking spaces, including aisle widths and <br />X <br />disabled parking spaces. <br />Show location, dimensions, and number of bicycle parking spaces, including long-term and short-term bicycle <br />X <br />parking. <br /> Show landscaping and screening for parking area. <br />X <br /> Show means of protecting landscaping (i.e, curbs). <br />X <br /> Show location and height of proposed lighting for parking area. <br />X <br /> Show designated carpool and vanpool parking spaces for developments with 20 or more employees. <br />X <br />Wastewater Requirements <br /> Show the location and flow line elevation of the existing public wastewater sewer at proposed connection point(s). <br />X <br /> Show the existing and proposed wastewater sewer layout. <br />X <br />Water Supply <br /> Show diameter of existing and proposed water main. <br />X <br /> Show existing and proposed fire hydrants. <br />X <br />Contour Intervals <br />Show existing and proposed contours at one of the following intervals and must be based on City Bench Mark (North <br />American Vertical Datum of 1988 (NAV 88). The City Bench Mark used must be noted on the plan. <br />Indicate bench mark used. <br /> One-foot contour intervals for ground slopes up to five percent. <br />X <br /> Two-foot contour intervals for ground slopes between five and ten percent. <br />X <br /> Five-foot contour intervals for ground slopes exceeding ten percent. <br />X <br /> Indicate which bench mark used. <br />X <br /> Existing vegetation to be preserved shall be shown on contour map. <br />X <br />Storm Drainage Requirements <br /> Show the location and flow line elevation of the existing piped public system at proposed connection point(s). <br />X <br />Show existing and proposed storm drainage, including disposition of storm water for all lots. <br />X <br /> <br />www.eugene-or.gov/planning <br /> <br />Planning & Development Updated: March 2014 <br />Planning Division <br />99 W. 10 Avenue, Eugene, OR 97401 <br />TH <br />Phone: 541.682.5377 or E-mail: eugeneplanning@ci.eugene.or.us Page 3 of 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.