My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
CU
>
2018
>
CU 18-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 8:24:25 AM
Creation date
2/26/2018 5:26:03 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
18
File Sequence Number
1
Application Name
U OF O NORTH CAMPUS
Document Type
Application Materials
Document_Date
2/26/2018
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIVERSITY OF OREGON <br />NORTH CAMPUS <br />CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION <br />.8 Public Access -- Parking Area Development <br />Item 1: Details will be provided regarding location, number, and dimensions of existing and <br />proposed parking spaces, including aisle widths and disabled parking spaces and <br />reviewed by the city through the standard development process as they become <br />available. <br />Item 2: Details will be provided regarding location, dimensions, and number of bicycle <br />parking spaces, including long-term and short-term bicycle parking, and reviewed <br />by the city through the standard development process as they become available. <br />Item 3: Details will be provided on individual projects regarding proposed landscaping <br />and screening for parking areas and reviewed by the city through the standard <br />development process as they become available. <br />Item 4: Details will be provided on individual projects regarding curbs and other means <br />of protecting landscaping and reviewed by the city through the standard <br />development process as they become available. <br />Item 5: Details will be provided on individual projects regarding height and location of <br />parking area lighting and reviewed by the city through the standard development <br />process as they become available. <br />Item 6: Details will be provided on individual projects regarding designated carpool and <br />vanpool parking spaces for developments with 20 or more employees and <br />reviewed by the city through the standard development process as they become <br />available. <br />.9 Wastewater Requirements <br />Item 1: Details will be provided on individual projects regarding location and flow line <br />elevation of the existing public wastewater sewer at proposed connection point(s) <br />and reviewed by the city through the standard development process as they <br />become available. <br />Item 2: Existing and possible future wastewater sewer layout is shown on Sheet C02 <br />Sanitary Sewer Plan (Exhibit A). <br />.10 Water Supply <br />Item 1: Diameter of existing and possible future water main is shown on Sheet C03 Water <br />Supply Plan (Exhibit A). <br />Item 2: Details will be provided on individual projects regarding existing and proposed fire <br />hydrants and reviewed by the city through the standard development process as <br />they become available. <br /> <br />Cameron McCarthy INITIAL SUBMITTAL | February 21, 2018 47 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.