ATTACHMENT 7A: Conceptual Study <br />KEY <br />100-foot Conservation <br />General HardscapeDevelopment Site <br />Setback <br />Bank Layback & <br />Physical Education & <br />Seasonal Wetlands <br />Riparian Restoration <br />Recreation Field <br />Native PlantingBike PathBuilding Footprint <br />General Open SpaceTrail <br />Neighboring <br />EWEB Masterplan <br />Lookout <br />Property <br />WILLAMETTE <br />RIVER <br />Fossil <br />Beach <br />Lookout <br />PPC Launch <br />City’s Proposed <br />Turnaround Design <br />TRAIN TRACKS <br />MILLRACE <br />OUTFALL <br />NORTH CAMPUS CONDITIONAL USE PERMIT <br />DRAFT ILLUSTRATIVE CONCEPT 1 <br />10.19.2017 <br /> <br />