Campus Planning <br />October 16, 2017 <br />MEMORANDUM <br />To: Campus Planning Committee <br />From: Eleni Tsivitzi, Campus Planning <br /> Campus Planning and Facilities Management (CPFM) <br />Subject: Record of the October 10, 2017 Campus Planning Committee Meeting <br /> <br />Attending: <br /> Michael Harwood, Ken Kato, Peter Keyes, Diana Libuda, Josh McCoy, <br /> Kevin Reed, Bitty Roy, Cathy Soutar, Rob Thallon, Christine Thompson, <br /> Chuck Triplett <br /> Eleni Tsivitzi (Campus Planning) <br />Guests: <br />CPC Agenda: <br /> <br />1. Knight Campus - Update <br />Background: Mike Harwood updated the Campus Planning Committee on the progress of the <br />Knight Campus Project since the last meeting. Schematic design is wrapping up and cost <br />estimates are being generated and vetted. <br />The Knight Campus project team has partnered with the College of Design on a landscape <br />architecture studio focusing on the Millrace and on an architecture studio studying a <br />proposed academic building between the Onyx Street crossing and the Knight Campus site. <br />Rob Thallon praised the process being followed for this project. He credited a strong user <br />group and an excellent design team with the success of the project thus far. <br />More visual materials will be available to share with the CPC in the near future. <br />Action: No action was requested. <br />CAMPUS PLANNING AND FACILITIES MANAGEMENT <br />1276 University of Oregon, Eugene OR 97403-1276 T (541) 346 - 5562 http://uplan.uoregon.edu <br /> <br />