UO North Campus November 7, 2017 <br />Conceptual Infrastructure Analysis <br /> <br /> <br /> <br />New public and private fire hydrants will be required with redevelopment throughout the site. New <br />hydrant locations will conform to the Oregon Fire Code. <br /> <br />Based on past pressure/flow test data in the area, the static pressure within the public system is <br />expected to range between 68-72 psi, depending on the time of day. Both the Riverfront Parkway <br />and East 8 th Avenue systems are expected to produce adequate fire flows. However, flow test <br />information should be obtained to confirm available pressures and flows. Looped systems may be <br />preferred to improve flows and circulation. <br /> <br /> <br /> <br /> <br /> |9 <br /> <br />