My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
21 ORD PA 1345 - Final Ex. G App. E (Findings - UGB Methodology)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
21 ORD PA 1345 - Final Ex. G App. E (Findings - UGB Methodology)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 3:34:07 PM
Creation date
1/19/2018 3:34:02 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB Adoption Package
Document Type
Ordinance
Document_Date
8/17/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Legal Standard <br />OAR 660-024-0020(2): <br />city and county plan and zone maps at a scale sufficient to determine which particular <br />lots or parcels are included in the UGB. Where a UGB does not follow lot or parcel lines, <br />the map must provide s <br />Methodology <br />1.The methodology to determine the precise location of the Eugene UGB is based on the <br /> <br />methodology to determine the Eugene-Springfield Metropolitan Urban Growth <br />Boundary. <br />2.For areas of the Eugene UGB where the Metro Plan methodology provided room for <br /> <br />interpretation, Eugene adapted the methodology used by the City of Springfield to <br />establish a Springfield-specific UGB. <br />3.The Eugene UGB is tax lot-specific where it: <br /> <br />a.Is coterminous with city limits; <br /> <br />b.Has been determined through the annexation process; or <br /> <br />c.Falls on the outside edge of existing or planned rights-of-way <br /> <br />4.With the exception of I-5, the UGB shall lie along the outside edge of existing and <br /> <br />planned rights-of-way that form a portion of the UGB so that the full right-of-way is <br />within the UGB. <br />5.The location of the UGB in relation to the I-5 corridor is based on the <br /> <br />section in Chapter II of the Metro Plan, which identifies the area within <br />the UGB on the west side of I-5 as Eugene. <br />a.General Description. Generally, the Eugene UGB follows the centerline of I-5. <br /> <br />The southbound lane (west side of I-5) is inside the Eugene UGB. <br />b.Northern Terminus. The Eugene UGB terminates at a point where of the <br /> <br />northern outside edge of the Game Farm Road right-of-way and the centerline of <br />the I-5 right-of-way intersect. <br />c.Southern Terminus. The Eugene UGB terminates at a point created by extending <br /> <br />a line from the easterly corner of tax lot 1803034001001 (as of July 31, 2015) to <br />the east until it intersects with the centerline of the I-5 right-of-way. <br />d. Specific Description. of the UGB <br /> <br />along I-5. <br />6.Where the Metropolitan UGB is not clearly coterminous with city limits, has not been <br /> <br />determined through the annexation process, does not falls on the outside edge of <br />existing or planned rights-of-way or does not follow the centerline of I-5, the following <br />Appendix E to Findings Final Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.