_ Eugene Water & Electric Board <br />4200 Roosevelt Blvd. <br />F7 P.O. n ,CB Eugene, Box 10148 <br />0~0 V C Eugene, OR R 97 <br />97440.2148 <br />Electric comments or questions can be directed to: <br />Jon Thomas <br />Planner IV <br />Eugene Water & Electric Board <br />Office/Fax 541-685-7472; ion.thomas(o)-eweb.ora <br />Water Comments: <br />EWEB's existing water infrastructure in the area is insufficient to serve the proposed <br />development. Contact EWEB's water engineering department so options for a distribution <br />system design can be looked at. <br />The Applicant is advised to contact the Fire Marshall's office about fire protection requirements <br />for building permits. <br />EWEB water does not allow installation of any water facilities under proposed "rain gardens" or <br />any open drainage structure within the right-of-way. Provisions within the design must be made <br />to accommodate the installation of water facilities (services & hydrants) at common lot corners. <br />A minimum 5' wide "utility corridor" at service crossing and hydrant locations is required. <br />State Drinking Water regulations (OAR 333-061-0050(10)) require a minimum separation <br />between water and sewer lines of 10' where they run parallel to each other, or 5' if the sewer <br />line is located at least 1.5' below the water main. <br />EWEB owned water facilities will be located in the right-of-way or a minimum 7' public utility <br />easement (PUE) adjacent to the right-of-way, or in a 14' PUE when not located adjacent to the <br />right-of-way. <br />Water comments or questions can be directed to: <br />Bill Johnson <br />Water Engineering Technician IV <br />Eugene Water & Electric Board <br />Office/Fax 541-685-7377; bill. <br />iohnsonCeweb.org <br />Right-of-Way Comments: <br />Those EWEB utility easements Instrument Nos. 18885 & 18881, recorded on December 12, <br />1953, on Reel 29' 53D, Lane County Deeds & Records, (EWEB doc. #1574) may affect the <br />development's northerly boundary and should be referenced on the plat. <br />There are existing electric facilities crossing Tax Lot 400 to serve Tax Lots 200 and 300. Either <br />Public Utility Easement(s) dedicated on the plat or EWEB Utility Easement(s) recorded <br />simultaneously with and referenced on the plat will be necessary to cover any existing or new <br />electric service(s) that cross any parcel(s) to serve another parcel(s). Contact EWEB Electric <br />Distribution who will design electric extension to serve the development and determine the width <br />and length necessary for any necessary utilitiy easements. <br />If a Public Utility Easement (PUE) is dedicated on the plat, the plat should include the <br />customary Note for PUEs: "No building, structure, trees, shrubbery or other obstruction shall be <br />placed or located on or in a public utility easement." Or, at the customer's request, EWEB can <br />Rey Gil WJ. <br />