My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SUPPLEMENTAL MATERIALS (8-22-17)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
SUPPLEMENTAL MATERIALS (8-22-17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2017 4:09:06 PM
Creation date
9/18/2017 9:29:55 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL
Document Type
Supplemental Materials
Document_Date
8/22/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD Page 2 of 67 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 (Revised:June 19, 2017, August 22, 2017) <br />Table of Contents <br />Page Numbers <br />PUD Application .............................................................................................................3-6 <br />PUD Site Plan Requirements .......................................................................................7-11 <br />PUD Written Statement ..............................................................................................12 - 66 <br />Conclusion 67 <br />Attachments <br />(all submitted prior) <br />Except: Stormwater Management Plan and Drainage Study resubmitted <br />Except: Traffic Safety Study resubmitted <br />Except: Disk with video submitted for first time this written statement <br />Attachment A <br />Air Photo Greater Context <br />Attachment B <br />Air Photo <br />Attachment C <br />Tax Lot Map RLID <br />Attachment D <br />Tax Lot Map <br />Attachment E <br />Zoning: City of Eugene <br />Attachment F <br />Metropolitan Area General Plan <br />Attachment G <br />Legal Description <br />Attachment H <br />Goal 5 Map <br />Attachment I <br />Ribbon Trail Map <br />Attachment J <br />Street Connectivity North <br />Attachment K <br />Street Connectivity East <br />Attachment L <br />Neighborhood Meeting Documents <br />Meeting Invite (Exhibit A) <br />Mailing List (Exhibit B) <br />Affidavit of Posting <br />Photo of Posted Sign <br />Affidavit of Mailing <br />Meeting Notes <br />Notes from Flip Chart (used at meeting) <br />Sign In Sheet <br />Meeting Guidelines <br />Site Plan Presented at Meeting <br />Power Point Shown at Meeting <br />Attachment M <br />Land Use Decisions Prior <br />AZ 81-3 Ordinance No. 18900 <br />AZ 82-3 Ordinance 19060 <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.