Capital Hill PUD Page 51 of 67 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3, 2017 (Revised:June 19, 2017, August 22, 2017) <br />Lot 27 <br />180+ feet on Cupola Drive <br />Lot 28 <br />90+ feet on Cupola Drive <br />Lot 29 <br />95+ feet on Cupola Drive <br />Lot 30 <br />80+ feet on Cupola Drive <br />Lot 31 <br />130+ feet on Cupola Drive <br />Lot 32 <br />90+ feet on Cupola Drive <br />Lot 33 <br />115+ fee on Cupola <br />(b) EC 9.6500 through EC 9.6505 Public Improvement Standards. <br />EC 9.6500 Easements. <br />(1) The city may require the dedication of easements for wastewater sewers and other public <br />utilities, and for access thereto for maintenance, of a sufficient width to meet the intended use, <br />provided the city makes findings to demonstrate consistency with constitutional requirements. <br />See Site Plan for location of proposed utility easements. <br />(2) Easements may be required along lot or parcel rear lines or side lines, or elsewhere as <br />necessary to provide needed facilities for present or future development of the area. <br />See Site Plan for location of proposed utility easements. <br />(3) No building, structure, tree, or other obstruction shall be placed or located on or in a public utility <br />easement. Prior to approval of a final PUD, final site review plans, or final plats, there shall <br />appear thereon a restriction showing compliance with this subsection. <br />Acknowledged and agreed. <br />EC 9.6505 Improvements - Specifications. All public improvements shall be designed and <br />constructed in accordance with adopted plans and policies, the procedures specified in Chapter 7 <br />of this code, and standards and specifications adopted pursuant to Chapter 7 of this <br />code. Additionally, all developments shall make and be served by the following infrastructure <br />improvements: <br />(1) Water Supply. All developments shall be served by the water system of the Eugene Water & <br />Electric Board. <br />See Sheet C1: Wastewater and Water Plan. <br />(2) Sewage. All developments shall be served by the wastewater sewage system of the city, <br />complying with provisions in Chapter 6 of this code. Public improvements will be constructed <br />privately. <br />See Sheet C1: Wastewater and Water Plan. <br />(3) Streets and Alleys. <br />(a) The developer shall grade and pave all streets and alleys in the development site. All paving <br />shall be to the width specified in EC 9.6870 Street Width and provide for drainage of all such <br />streets and alleys <br />There is one street proposed as a private drive and is currently called Cupola Drive. It is <br />paved to 21' wide, but it is not considered a public improvement. <br />(b) The developer shall pave streets and alleys adjacent to the development site to the width <br />specified in EC 9.6870 Street Width, unless such streets and alleys are already paved to that <br />width, provided the City makes findings to demonstrate consistency with constitutional <br />requirements. <br />Capital Drive is adjacent to the development site. It is considered a low volume local street. <br />Table 9.6870 requires a 45'- 55' right of way with 20'- 28' of paving. The right of way is <br />already dedicated at 50'. The existing street is undersized, narrowing to just 14 feet in some <br />places. There are currently no sidewalks. This street will be improved so the paving is a full <br />21' and a 4' sidewalk will be constructed on the development side of the street. <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />